Expeditions changes
In the 2023-12-04 release release.
-
Changed MANA21318 (2021) — NE Face 1 field
Field Before After Total Members 1413 -
Changed MANA21319 (2021) — NE Face 2 fields
Field Before After Total Hired 34 Route Notes … 14 Sep, he went up little above BC. Team returned to Ktm by heleheli on 30 Sept. Note: Why they did not try for the … -
Changed MANA75101 (1975) — NE Face 1 field
Field Before After Route Notes … the 31 Rivas, Soria, Blazquez and J. Lopez. We began today our 5 days of walking. … this night we shall sleep near the Doban KolaKhola River. Weather is good, some days too warm. Until now all thinks all right. -
Changed MANA79301 (1979) — E Ridge 1 field
Field Before After Route Notes Letter from Deputy Leader Hector Cuinas - Nov 79 Base Camp was located at 4370m about 250m above a "karka""kharka" (yak pasture field, where there are some sheperd's … may be scarce towards the end of October. From base camp we followed the course of … -
Changed MANA97304 (1997) — E Ridge (Austrian & Swiss rtes) 1 field
Field Before After Agency Rolwaling TreksRolwaling Trek -
Changed MANA98301 (1998) — NE Face 1 field
Field Before After Agency Rolwaling TreksRolwaling Trek -
Changed MANA99103 (1999) — NE Face 1 field
Field Before After Route Notes … of summit plateau (slightly before out of wind). Rested in BC from 13th to 17th and … after waiting one day, walked to Phillum, where chopperhelicopter picked them up to take them to Dhaulagiri I. -
Changed MERA85101 (1985) — W Face-Mera Peak W Smt 1 field
Field Before After Route Notes … only with 28 days to door to door. They were accompanied by 6 porters and Sherpa and a kitchen boy to arrive at Tangnag KarkaKharka on March. He found a possible line through … -
Changed MUKT15301 (2015) — N Ridge 1 field
Field Before After Route Notes … most 600m of the route in fixed rope. Approach marchthrough Mu La (the highlight for most of the unexperienced members). Difficulties: 45/50-degree slopes below col on the North … -
Changed NALA00201 (2000) — S Ridge 1 field
Field Before After Route Notes … Oxygen: none. Deaths, accidents, illness: none. Source: Ohnishi Approach march:Approach: air to Nepalgunj 2 June, air (helicopter) to … scaled West Face to summit on 28 June. Changwatang summiters: Tamotsu Ohnishi, Koji Mizutani, Nobuo Akayama, … -
Changed NAUL54101 (1954) — N Side 1 field
Field Before After Other Summits Climbed Baruntse (BARU-541-01), Pethangtse (PETH-541-01)(PETH-541-01), Pethangtse East (PTHE-541-01) and Chago (CHAG-541-01) (all 1st ascents); attempted attempted … -
Changed NEPA39101 (1939) — S Ridge from E 1 field
Field Before After Other Summits Climbed Kirat Chuli (KIRA-391-01);(KIRA-391-01) and Langpo South (LNPS-392-01); attempted Gimmigela Chuli(GIMM-391-01), Langpo (LNPO-391-01)(GIMM-392-01) and Pyramid Peak(PYRM-391-01)(PYRM-392-01) -
Changed NUPL18301 (2018) — SW Ridge 1 field
Field Before After Route Notes Approach march route:Approach: Helicopter from KTM to Lukla, trekked to BC … Goyko 5th lake. Helicopter from BC to ABC. BC 28/10 5000m Gokyo 5th lake ABC 31/10 5848m Nup La Pass Smt 02/11 by all members (exceptLeclaire)LeClaire) and all hired. BC at Gokyo 5th lake. Climbed Gokyo Ri … Settemsdel stayed in Khumbu to attempt Ama Dablam. CarolynLeclaireLeClaire (was on the permit, but decided not to … went to Gokyo and left the team there). Team left BC on 03/11. Oxygen: Taken and … -
Changed NUPT11102 (2011) — W Shoulder-W Ridge (to 6500m) 1 field
Field Before After Route Notes … 6500m, then down the mountain's West Ridge to Gorakshep,Gorak Shep, where they had their BC. Benegas said the two men seen were probably Gukov and Moldozhen. A week later the same two climbers were … -
Changed NUPT11301 (2011) — W Face 1 field
Field Before After Route Notes BC at Gorakshep'sGorak Shep's Himalayan Lodge. Before attempting his solo ascent of the seldom-climbed … 10 October) and Island Peak (on 15 October). Then Zangrilli went alone toGorakshepGorak Shep on 31 October. He made the Himalayan Lodge … to get to the bottom of the wall." But it turned out to be very easy to reach. On the 5th he leftGorakshepGorak Shep and it took him only two hours to … a gas stove and two canisters of gas. At midnight of the 5th/6th he woke up … to ascend 20 meters and then gave up. At 6:00 am on 7 November he started … pm, he was back at his BC atGorakshep.Gorak Shep. He wants to attempt the West Face next … -
Changed NUPT12101 (2012) — N Pillar 2 fields
Field Before After Other Summits Climbed Lobuje East and Lhotse to acclimatizeClimbed Lobuche East and Lhotse to acclimatize Route Notes … East I and finally to Nuptse's main summit. But first, they acclimatized on LobujeLobuche East and spent the night of 16/17 April … back to Everest BC, which was their BC. From BC, they went to the bergschrund at … -
Changed NUPT12102 (2012) — N Face 1 field
Field Before After Route Notes After the team arrived at BC, they went to LobujeLobuche East for an acclimatization climb. They summited the … 28th, then returned to BC on the 30th. At this time, the Khumbu Icefall was very … -
Changed NUPT13103 (2013) — NE Spur/Ridge 1 field
Field Before After Route Notes … Icefall again. She left BC on 7 May. Dodhia, who never intended to climb Nuptse but … C2, reached BC. She was too slow on LobujeLobuche East and Brice thought it would be dangerous to send her through the Khumbu Icefall. Tait never intended to climb Nuptse either. He … -
Changed NUPT15301 (2015) — S Face (Bonington rte) 1 field
Field Before After Route Notes … those teams mixed together during the expedition time. During their acclimatization, Ueli went to Chhukung Ri … and down (meaning 1000m/hr rhythm) and also on LobujeLobuche East. Ueli also went on Cholatse's North Face … of Cholatse, which Ueli is very happy with. On 17 Oct Ben and Ueli had some … -
Changed NUPT22101 (2022) — Khumbu Icefall (diversion) 1 field
Field Before After Route Notes Approach: Everest BC trail BC 19/04 5170m at GorakshepGorak Shep IC 22/04 5600m close to Pt 5656m of Kielkowski. C1 28/04 5920m HPt 29/04 6020m by Marc&and Alan Batard, Pasang Sherpa and Tenji Sherpa. "New route", using French 1984 direct variant to … -
Changed NUPT22102 (2022) — NE Spur 1 field
Field Before After Termination Notes Abandoned at 7820m due to dangerous cornice, lateness ofdayday, exhaustion andexhaustionlack of fixed rope -
Changed NUPT81302 (1981) — W Ridge 1 field
Field Before After Route Notes … 15 days round trip, so party of 6. BC about at Gorakshep.Gorak Shep. Try alpine-style. Food and gas dump on plateau … -
Changed NUPT86101 (1986) — S Spur of SE Smt 1 field
Field Before After Other Summits Climbed Lobuje East and Kangtega (KTEG-861-02)Climbed Lobuche East and Kangtega (KTEG-861-02) -
Changed NUPW77101 (1977) — NW Ridge-NW Smt from N 1 field
Field Before After Route Notes … and Sherpas well. Kato - 12 Feb 77 Do not climb through Khumbu Icefall; go past GorakshepGorak Shep to foot of Icefall with BC at 5300 … Everest BC. No avalanche problem this side Nuptse. Climb Nuptse via NW Ridge South new route … -
Changed NUPW96201 (1996) — NW Ridge 1 field
Field Before After Route Notes BC on rock slightly above and east of Pt 5334m (ENE of Gorakshep)Gorak Shep) C1 on little summit northwest of Pt 7154m C2 small rock plateau south of Pt 7154m. 30 July snow falling and avalanching so that … Sherpa left C2 for BC. 31 July toLobujeLobuche and climb finished because of bad weather. Climb … -
Changed NUPW97301 (1997) — W Face-NW Smt 1 field
Field Before After Other Summits Climbed Lobuje East (LOBE-973-01) and Pumori (PUMO-973-07)Climbed Lobuche East (LOBE-973-01) and Pumori (PUMO-973-07) -
Changed PAN109301 (2009) — W Ridge 1 field
Field Before After Route Notes Approach march:Approach: Besisahar->Marshyangdi->Buri Gandaki->Samdo, E on N side of Sonam Glacier. The team went by bus to Besisahar and … -
Changed PAN119301 (2019) — W Ridge-N Ridge 1 field
Field Before After Route Notes … ascent). Rest days in BC for 3 days. 07/10: To Bhimtang.Bimthang. 08/10: To Dharapani. 09/10: To KTM. -
Changed PAN219301 (2019) — SW Ridge 1 field
Field Before After Route Notes … ascent). Rest days in BC for 3 days. 07/10: To Bhimtang.Bimthang. 08/10: To Dharapani. 09/10: To KTM. -
Changed PANB11301 (2011) — NE side 1 field
Field Before After Route Notes Approach march:Approach: Besisahar, Dharapani, Bimthang, Saipudonda Glacier, Larkya La, Athahra Saya Khola. This new route over Hindu Himal east slope … -
Changed PANT55101 (1955) — SW side 1 field
Field Before After Route 1 -SW side -
Changed PASA06101 (2006) — S Pillar-S Face 1 field
Field Before After Route Notes … pillar High point at snow field above pillar. Pillar not dangerous from rock avalanche, which fell … not seen body from C1 through binoculars (in chopperhelicopter too cloudy to see any thing). Kammerlander to BC 7:00 pm same day. He is deeply offended by Tourism Ministry's classifying … -
Changed PETH54101 (1954) — S Glacier 1 field
Field Before After Other Summits Climbed Baruntse (BARU-541-01), Pethangtse East (PTHE-541-01), Chago (CHAG-541-01) and Nau Lekh (NAUL-541-01) (all 1st … -
Changed PHAR03101 (2003) — W Face-SE Ridge 1 field
Field Before After Countries Brazil, Croatia, Romania, Russia, SloveniaAzerbaijan, Brazil, Croatia, Romania, Russia, Slovenia -
Changed PHUG11301 (2011) — E Ridge 1 field
Field Before After Route Notes Approach march:Approach: Besisahar, Dharapani, Bimthang, Saipudonda Glacier, Larkya La, Athahra Saya Khola. This new route over Hindu Himal east slope … -
Changed PK4108301 (2008) — W Face of S Smt 1 field
Field Before After Route Notes Khumbu Alpine Style 08 - 15 Oct & 15 Nov 2008 The two orginal members of the team, Bullock … east and southeast to BC via Zatrwala, Tuli Karka,Kharka, northeast to a small river named Hinku Drangka, … along the river to Tangnag, east to DigKarka,Kharka, again north to the south end of the … lake. They arrived at BC on 4 October. On the 5th, Bullock went east on a … day before their planned assault on the mountain. They spent that night with an American expedition to Kangtega who were at DigKarkaKharka enroute to their BC. On the 12th they retreated to TuliKarka,Kharka, on the 13th got to Lukla and were back in Kathmandu on the 14th. Bullock hoped his sponsor would could to the … the 30th. They rested there for two days. On 2 November Bullock and Noddings moved east to DigKarkaKharka and north to 5200m on moraine east of … back there on the 4th and bivouacked there. Now the climb could begin. On 5 November … -
Changed POKA76101 (1976) 1 field
Field Before After Other Summits Climbed Everest (EVER-761-01), Island Peak, Lobuje East and ChhukungClimbed Everest (EVER-761-01), Island Peak, Lobuche East and Chhukung -
Changed POKR22101 (2022) — N side 1 field
Field Before After Leaders Arnauld De JaureguiberryArnaud De Jaureguiberry -
Changed PTHE08101 (2008) — S Ridge 1 field
Field Before After Ascent 1 -2nd -
Changed PUMO01302 (2001) — NE Face/Ridge 1 field
Field Before After Route Notes BC above lake at normal place C1 at rib on NE Face. 5 who died went to C1 on 16th … them 600-800m down. Benantxio saw 2 bodies after chopperhelicopter search on 18th, saw backpacks and 19th Benantxio … -
Changed PUMO01307 (2001) — S Face-SSW Ridge 1 field
Field Before After Route Notes BC at 5300m near smaller lake at GorakshepGorak Shep C1 at 6160m on Col of SSW Ridge … -
Changed PUMO02102 (2002) — SE Face 1 field
Field Before After Route Notes BC at 5200m at above GorakshepGorak Shep near a small lake ABC at 5420m at bottom of SE Face … -
Changed PUMO03302 (2003) — SW Ridge 1 field
Field Before After Route Notes … others to return to C1 and climb finished. Cook boy had gone ahead to Pumori BC … from Island Peak. He was carried down to LobujeLobuche by Canadian expedition. -
Changed PUMO04102 (2004) — SE Face 2 fields
Field Before After Other Summits Climbed Lobuje East (all 4 members and Pemba Temba Tarteg on 27th March)Climbed Lobuche East (all 4 members and Pemba Temba Tarteg on 27th March) Route Notes BC at new lake above GorakshepGorak Shep ABC at bottom of rock couloir C1 at … of SE Face. High point at big crevasse. Rented atGorakshepGorak Shep 4 ladders (2-4 metres each) for 8m crevasse … -
Changed PUMO04103 (2004) — SE Face 1 field
Field Before After Route Notes BC near small lake below long one at GorakshepGorak Shep C1 at bottom of face C2 on pillar … -
Changed PUMO04301 (2004) — SE Face-S Ridge 1 field
Field Before After Route Notes BC above Gorakshep,Gorak Shep, between big and little lake NE of Kalapattar C1 at SE Face below high glacier C2 … -
Changed PUMO04302 (2004) — SE Face-E Ridge 1 field
Field Before After Route Notes … windy but cold. Mingma Nuru descended to BC. The members who turned back from 6900m were: … enough; and leader Kenyon accompanied them to BC. Clarke,Clarke was evacuated from Pheriche by helicopter. Leader Kenyon returned to KTM on 31st. Four … -
Changed PUMO04303 (2004) — S Face-SW Ridge 2 fields
Field Before After Other Summits Climbed Lobuje East (Oct 28)Climbed Lobuche East (Oct 28) Route Notes Team never went to BC, never climbed Pumori. Team climbed LobujeLobuche East on 28th October. They rested in Dughla … -
Changed PUMO04305 (2004) — SE Face-E Col-E Ridge 1 field
Field Before After Route Notes BC above GorakshepGorak Shep near lake ABC at beginning of ice on small ridge … -
Changed PUMO05101 (2005) — SE Face 1 field
Field Before After Other Summits Attempted Lobuje East (to 6000m 13 April)Attempted Lobuche East (to 6000m 13 April)