Expeditions changes
In the 2026-07-10 release (Himal 2.75) release.
-
Changed HIML23103 (2023) — NW Ridge 1 field
Field Before After Sponsor Himlung Himal Mountaineering Reesearch Exp BMS-NMA-2023Himlung Himal Mountaineering Research Exp BMS-NMA-2023 -
Changed HIML23307 (2023) — NW Ridge 1 field
Field Before After Paraglide FalseTrue -
Changed JUG525101 (2025) — SW side 11 fields
Field Before After Route 1 -SW side Approach -Chhendang->Ne-Pewa->Palmo Thaneg Basecamp Date -2025-04-22 Summit Time -1100 Summit Days 03 Total Days 04 Termination Date -2025-04-26 Camps 01 Summit Members 12 Campsites Smt(25/04)BC(22/04,4700m),HC(24/04,5200m),Smt(25/04) Route Notes -Summit on 25/04 at 11 am, by Andrewsand Min Bahadur; they spent 5 minutes on the summit and back to HC at 2:30 pm. High point for Napier, Harrop and Altier was 5700m on 25/04. -
Changed KANG04101 (2004) — N Face-Ridge 1 field
Field Before After Traverse TrueFalse -
Changed KANG84101 (1984) — SW Face-Main Smt 1 field
Field Before After Traverse FalseTrue -
Changed KHAM23401 (2023) — SSW Face 1 field
Field Before After Route 1 N sideSSW Face -
Changed KHAY23301 (2023) — S side 1 field
Field Before After Agency -Yeti Montaiineering -
Changed KJRS74101 (1974) — S Face-E Ridge 1 field
Field Before After Route Notes Editor's Note: According to reports published in 1974 in the Iwa to Yuki, this team may have climbed Kasi Dalpha instead of Kanjiroba South. Kamei & Co. - 25 May 74 Kanjiroba … -
Changed LDNG17401 (2017) — SW Face-SE Ridge (up), SW Face (down) 1 field
Field Before After Route 1 SW Face-SE Ridge (up), W Face (down)SW Face-SE Ridge (up), SW Face (down) -
Changed LHOT22105 (2022) — S Col-W Face 5 fields
Field Before After Countries Germany, SwitzerlandGermany, Nepal, Switzerland Total Members 45 Summit Members 34 Total Hired 87 Summit Hired 43 -
Changed LHOT25102 (2025) — S Col-W Face 1 field
Field Before After Route Notes … AMS. Team left BC on 17/05 by heli. Oxygen: Taken and used from C3 to top … C2; Sherpa from C3 to top to C3. Report from Dwarka Dokhe (SVM): Summit team on top at 7:25 am, descended to C2 around 18:15 pm. Dwarka attemped on 15 May, but after reaching to height of around 8400m due to strong winds coming from couloir got the strong feeling of complete lost of sensation for all fingers and toes, so instead of moving towards summit descended back to C2. -
Changed LIK224301 (2024) — NW Ridge (up), W Ridge (down) 1 field
Field Before After Other Summits -Summited Takargo East (TKRE-243-01) -
Changed MAKA09108 (2009) — Makalu La-NW Ridge 1 field
Field Before After Traverse TrueFalse -
Changed MAKA16106 (2016) — Makalu La-NW Ridge 1 field
Field Before After Traverse TrueFalse -
Changed MAKA25101 (2025) — Makalu La-NW Ridge 1 field
Field Before After Approach -1 -
Changed MANA23314 (2023) — NE Face 4 fields
Field Before After Total Members 1112 Summit Members 78 Total Hired 1211 Summit Hired 65 -
Changed MANA97306 (1997) — NE Face 1 field
Field Before After Route Notes … (on top with Slovakian leader, other two later). Basque Mountaineer h]HasHas Important Success by Elizabeth Hawley When the leader of a climbing team of … -
Changed MUKT24401 (2024) — E Face-S Ridge 9 fields
Field Before After Route 1 E FaceE Face-S Ridge Approach -Darbang->Bagana->Dobang->Sallaghari->Swiss BC->Dhaulagiri BC->French Pass Basecamp Date -2025-01-12 Summit Days 04 Total Days 05 Termination Date -2025-01-17 Camps 12 Campsites BC,C1,Smt(16/01)BC(12/01,5300m),C1(14/01,5700m),C2(15/01,5950m),Smt(16/01) Route Notes -Summit push started at 8 am on 16 Jan and reached the summit at 9 am. They stayed on the summit for 20 minutes, then descended to BC. The elapsed time for summit to BC was 5 hours and 40 minutes. Weather on the summit day was windy and cold. Climbing route is likely South Ridge via East Face. -
Changed PHUR24301 (2024) — WSW Ridge 6 fields
Field Before After Route 1 -WSW Ridge Leaders Arosio TitoTito Arosio Termination Reason 75 Termination Notes Abandoned at 6500m due to health problemsAbandoned at 6550m due to deep snow High Point (m) 65006550 Campsites BC(18/10,3900m),...,xxx(30/10,6500m)BC(18/10,3900m),...,xxx(30/10,6550m) -
Changed PUMO01101 (2001) — W Face-S Ridge up; E Ridge-S Face/Ridge down 2 fields
Field Before After Route 1 W Face-S Ridge up; E Ridge-S Face/RidgeW Face-S Ridge up; E Ridge-S Face/Ridge down Traverse FalseTrue -
Changed PUTH11103 (2011) — NE Face 1 field
Field Before After Traverse TrueFalse -
Changed PUTH78101 (1978) — E Ridge from S 2 fields
Field Before After Traverse TrueFalse Route Notes Gunter Sturm - 11 Sept 78 1978 spring German attempt on Putha Hiunchuli (which he himself scaled in Autumn 781978 attempted in 1972) was not South Face but really was East Ridge from south. Graf - 26 April 78 At C3 6000m … -
Changed ROCN88301 (1988) — E Ridge (descent from Annapurna I East) 1 field
Field Before After Traverse FalseTrue -
Changed SANC24301 (2024) — SW Face-W Ridge 1 field
Field Before After Route 1 S Face-W RidgeSW Face-W Ridge -
Changed TENG21301 (2021) — S Ridge from south 1 field
Field Before After Agency High Mountain Himalaya TreksHigh Mountain Himalaya -
Changed TKPO21303 (2021) — E Ridge from S 1 field
Field Before After Route 1 E Ridge from southE Ridge from S -
Changed TKRE24301 (2024) — E Face 1 field
Field Before After Other Summits -Attempted Linkhu Chuli (LIK2-243-01) -
Changed URKM16101 (2016) — NNE Face-NE Ridge (up), W Ridge/Face (down) 1 field
Field Before After Traverse FalseTrue -
Changed YALU89101 (1989) — SE Ridge 1 field
Field Before After Traverse FalseTrue -
Removed SPH524301 (2024) — E side