Expeditions changes
In the 2023-12-04 release release.
-
Changed PUMO98303 (1998) — SE Face/Ridge by 2 members (to 7000m) 1 field
Field Before After Route Notes BC at LobujeLobuche (Pyramid Research Lab) ABC for southeast side pair High point on … -
Changed PURK04201 (2004) — W Ridge 1 field
Field Before After Route Notes BC north of Thorung Phedi C1 on West Ridge. Arrived Nepal 25 Jul, left KTM 26 July … which reached 20:00 hours. Returned to KTM by chopperhelicopter from Honde in Manang. -
Changed PUTH08103 (2008) — NE Face 1 field
Field Before After Route Notes … and left expedition before any climbing was done. Approach marchvia Darban (northwest of Beni) Dhorpatan, Tarakot, Barbung Khola to Kakkot, Kaya Khola to BC. Summit details On summit day the summit team … -
Changed RAMC02301 (2002) — S Face of E Ridge 1 field
Field Before After Route Notes … of his face and south of Pangpema BC. Doctor got to BC 3 Oct, immediately said she had typhus and left immediately by chopperhelicopter so team had to wait at BC 10 … psychosomatic symptoms; this delayed attempt on Kirat Chuli. "Maoists" Confrontation: Kresal and Haston flew bychopperhelicopter to BC with expedition's funds while rest of … airfield, so expedition flew out by helicopter fromGhunza,Ghunsa, well north of Taplejung. -
Changed RAMT00101 (2000) — E Ridge from S 1 field
Field Before After Route Notes … Mouse Glacier High point at below East Summit. David Goldsmith, Ben MacInnes, David Nicholls and Paul … of loose unconsolidated snow impossible to walk on. Another summit attempt was made on 1 May … -
Changed RATC00301 (2000) — W Ridge 1 field
Field Before After Route Notes … so. From a another team in the region: Team actually climbed Ratna Chuli. Had intended to climb this mountain all along, but since it is not on government … -
Changed RATC09301 (2009) — SW Face of W Smt 1 field
Field Before After Route 1 W Ridge-W SmtSW Face of W Smt -
Changed RATC13301 (2013) — W Smt-W Ridge 1 field
Field Before After Route 1 NW sideW Smt-W Ridge -
Changed RATC19101 (2019) — W Ridge 1 field
Field Before After Route 1 W FaceW Ridge -
Changed RATC19102 (2019) — W Ridge? 1 field
Field Before After Route 1 W Face?W Ridge? -
Changed RATC22102 (2022) — W Ridge? 1 field
Field Before After Route 1 W sideW Ridge? -
Changed RATC96301 (1996) — W Ridge via W Smt 2 fields
Field Before After Route 1 W Ridge via W PeakW Ridge via W Smt Route Notes BC at east of NaruPhu village (side of glacier) ABC at side of glacier C1 on plateau … old and Nepalese members also wanted rope fixed. People ofNargaonPhugaon very difficult: work only 1-2 hrs/day, very uncooperative (Tibetans). C2 establishment dealyed by heavy snowfall. High altitude … -
Changed SAIE10301 (2010) — W Face-N Ridge 1 field
Field Before After Route Notes … to Chala village and farther south to Kalang KarkaKharka and to BC. On the 18th, they arrived at BC (4150m), … -
Changed SAIP10301 (2010) — N Ridge 1 field
Field Before After Route Notes … to Chala village and farther south to Kalang KarkaKharka and to BC. On the 18th, they arrived at BC (4150m), … -
Changed SAIP18301 (2018) — SW Face 1 field
Field Before After Route Notes Approach march:Approach: Flight to Dhanghadi, 12 hour drive to Chainpur, 2 hour drive to Talkot, trekking from Talkot. BC 05/10 3955m ABC 10/10 4725m C1 20/10 … -
Changed SAIP92101 (1992) — NE Ridge 1 field
Field Before After Route Notes … explore south side of East Face as reconnaissance. 16 May descending below C2; Tenzing fell but … landed on lip of bergschrund. Nuru evacuated by chopper.helicopter. -
Changed SAMD09301 (2009) — N Ridge 1 field
Field Before After Route Notes ApproachApproach:march: Besisahar->Chimje->Tilje->Bimtong->highBesisahar->Chimje->Tilje->Bimthang->high camp->LarkyaPass->Samdo village.Pass->Samdo. On 5 Nov Bourgine, Clouet, Ulcakar, Babulal and … -
Changed SAMD09302 (2009) — NNE Ridge 1 field
Field Before After Route Notes Approach march:Approach: Besisahar->Marshyangdi->Buri Gandaki->Samdo, E on N side of Sonam Glacier. The team went by bus to Besisahar and … -
Changed SARI02201 (2002) — N Ridge from N 1 field
Field Before After Route Notes … June. Leader Ohnishi accompanied the Arniko Chuli team. Approach march:Approach: north and east via Chuksang (Chhusang), Tange and … mountain. Arrived at base camp on 12 July. Climb: on 14 July moved to high camp … -
Changed SARI09103 (2009) — E Face 1 field
Field Before After Route Notes Approach march:Approach: Bhulbhule->Dharapani->Koto->Meta->Khayang->Phu->Nugu Kharka->Nunka->Japan BC. Allen, Atkins, Casson, Grandison, Haala, Raza, Tomasic, Witham, … -
Changed TASH06301 (2006) — SW Ridge? 1 field
Field Before After Route Notes … Sherpas: Kancha Nuru, 6/9/63, Khumjung, Cho Oyu X2 Serap Jangbu, 25/7/69, Khumjung, Annapurna X1, EvEverest X2, etc, etc -
Changed TASH09301 (2009) — S Ridge 1 field
Field Before After Route Notes Approach march:Approach: By road to Beni and Marpha, crossed Thapa Pass into Hidden Valley->NE to BC. On 23 September Minamii and his two Sherpas … -
Changed TASH10302 (2010) — SE Ridge 1 field
Field Before After Agency Rolwaling TreksRolwaling Trek -
Changed TAWO07301 (2007) — S Face 2 fields
Field Before After Other Summits Climbed Mt. Abi and Lobuje EastClimbed Mt. Abi and Lobuche East Route Notes TabocheTawoche Expedition The expedition had a permit to climb Tawoche … and slept in the lake camp that night. The team then trekked southeast, crossed the Cho … on the 27th made their base camp forLobujeLobuche East at 5200m. On the 29th, Leuzinger, Oswald … on the 30th, the team trekked to Pheriche. By this time, all members had bad coughs … -
Changed TAWO09301 (2009) — N Face (up); S Face-E Face (down) 2 fields
Field Before After Other Summits Attempted Lobuje East (to 6000m)Attempted Lobuche East (to 6000m) Route Notes The two-member team first went to LobujeLobuche East to acclimatize. They climbed via the North Face Tsho Glacier to 6000m on 9 November. On the 11th, they went to Pheriche for … -
Changed TAWO89401 (1989) — NE Pillar (to 5500m) 2 fields
Field Before After Other Summits Climbed Lobuje East (LOBE-894-01) and PokaldeClimbed Lobuche East (LOBE-894-01) and Pokalde Route Notes … same route to last biv. 19th to BC. LobujeLobuche East climbed by Etherington and Schneider. Left BC 16th Dec; one night inLobujeLobuche village; 17th to base of E Face couloir; … BC. 22nd other two left BC to tryLobujeLobuche East and got to 5200m; 23rd to bottom of couloir 5400m where exhausted and back down. Pokalde climbed by Etherington; left BC 22nd at … -
Changed THAM64301 (1964) — W Face-S Ridge 1 field
Field Before After Route Notes … ft mountain of fleeted snow rearing above Khumjung." "Kantega,"Kangtega, Tawache, Thamserku and Ama Dablam - their names … by these terrible ice-encrusted walls and airy buttresses? McKinnon and Stewart climbers and also for physiological … -
Changed TILI02301 (2002) — N Spur-N Ridge 1 field
Field Before After Route Notes … Ropes used BC->C1 300m, C1->C2 300m more only Erdman got frostbitten feet and left by choppers;helicopter; seriousness not known yet. Vrolyk did not go above BC; had problem … -
Changed TILI06303 (2006) — NE Spur-N Ridge 1 field
Field Before After Route Notes … They descended to BC on 28 Oct. Sherpa: Lhakpa Tshering, Khumjung, 24/6/75, EvEverest X3, Annapurna I X1 -
Changed TILI06306 (2006) — NE Spur-N Ridge 1 field
Field Before After Route Notes … Nov. Sherpas: Ang Gelbu Sherpa (20/7/65), Jubing-7, Paiya Ang Pemba Sherpa (25/7/78), Namche-7, Mende, EvEverest X1, Cho Oyu X1 Mingma Dorje Sherpa (22/7/63), Jubing-1, Kharikhola -
Changed TILI08304 (2008) — NE Spur-N Ridge 1 field
Field Before After Route Notes … 9 Nov. Fixed rope: 300m before C1. Sherpas: Nima Kancha Sherpa, 19/7/75 (03/04/2032), Pare, Namche-6, EvEverest 18/5/06 Ang Nima Sherpa, 14/5/84 (01/02/2041),PangbochePangboche,EvEverest X3, Cho Oyu X1 Mingma Tshering Sherpa, 21/3/76 (08/12/2032), Khunde Ang Namgyal (Tshering Namgyal) -
Changed TILI90301 (1990) — S Ridge-S Face 1 field
Field Before After Route Notes … only ridge possible without hammock on S Face. Had more camps than perhaps normal because wanted … down and Ridoutt rushed to Jomsom to summon choppera helicopter which removed him from BC 16th Oct. Now … Dower's unnecessary risk cost the others the summit. Resumed climb on 16th and fixed more rope. … -
Changed TUKU08303 (2008) — N Ridge 1 field
Field Before After Route Notes … Oct. Hired: Ram Kazi Tamang, 10/6/77 (28/02/2034), Deusa-6 Tika Bahadur Tamang, 36 yrs, Rampur-8, Ramechap, Cho Oyu X1, EvEverest X1 Chepa Sherpa, 29/10/83 (12/07/2040), Sotang-6 Fixed rope: 2200m above C1 -
Changed URKM09301 (2009) — W Ridge 1 field
Field Before After Route Notes Approach march route:Approach: Dhunche, Syabru, Ama Hotel, Langtang, Kyanjin, Langshisa Kharka, Langshisa Glacier north of Urkinmang The team camped north of Urkinmang. It was …