Expeditions changes
In the 2018-12-16 release release.
-
Changed NUMB16301 (2016) — S Face 1 field
Field Before After Other Summits -Attempted Karyolung (KARY-163-01) -
Changed NUPT07101 (2007) — N Face 23 fields
Field Before After Route 1 NW RidgeN Face Nationality ItalyUSA Leaders Diego GiovanniniJim Williams Sponsor Nuptse 2007Exploradus Everest and Nuptse Approach -Lukla Basecamp Date 2007-04-282007-04-12 Summit Date 2007-05-192007-05-23 Summit Days 2141 Total Days 2546 Termination Date 2007-05-232007-05-28 Termination Reason 105 Termination Notes Abandoned at 6400m due to gear lost, men tired, too small of a teamAbandoned at 7300m due to bad snow conditions High Point (m) 64007300 Camps 03 Fixed Rope (m) 1200300 Total Members 24 Other Summits -Climbed Everest (EVER-071-85) Campsites BC(28/04,5350m),xxx(19/05,6400m)BC(12/04,5200m),C1(17/04,6000m),C2(25/04,6400m),C3(21/05,7000m),xxx(23/05,7300m) Route Notes BCOnat22EverstMayBCandsite23 May Williams was fixing rope. High point team left C3 atNW7Ridge.am to fix rope. Weather on 23 May was calm, sunny and hot. When they got to high point where rib meets the face at 1 pm, Williams decided to turn back due to bad snow conditions. They also did not have enough rope to fix. They descended to C3, arrived at 3:30 pm. On 24 May Hesser descended to BC. Williams and Leonard spent night at C1. Williams helped Sherpas and Morton a bit with Pemba Doma's body between C1 and BC.2FallonMayVaughnbothleftmembers started up NW Ridge, taking turns leading. Could workBC onroute20onlyApril;8shedaysreachedbecauseabout 5350m to first ladder oftooicefall,muchbutsnownever really intended to climb. During Robert Vaughn's Everest attempt, Williams andavalanchingHesserfixing foot of ridgestayed at5300mC2 to6400mcoordinate. LeonardonstayedveryatsteepBCridgeto(90-95dodegrees in one rock section) of ice, snow, rock. Team gear stored near bottom of ridge in small valleydispatches andonrun21stBC.foundSheDinajoined(4 meters deep lakeWilliams andgearHesserlost).atMeanwhileC2veryattired19and gear gone and team too small: need 4-member team so pairs can take turns making route. Giovannini wants to return this autumn with 3 other members.May.Agency Thamserku Trekking (Parajuli)Sherpa Shangri-La Trekking Primary Route FalseTrue Primary Member FalseTrue Primary ID -EVER07185 -
Changed NUPT17101 (2017) — N Face 2 fields
Field Before After Total Hired 01 No Hired TrueFalse -
Changed OMIT14302 (2014) — E side 1 field
Field Before After Route 1 S sideE side -
Changed PALD06301 (2006) 4 fields
Field Before After Sponsor French to Ganesh VIIFrench to Ganesh V Other Summits Attempted Ganesh VII illegally (GAN7-063-01)Attempted Ganesh V illegally (GAN5-063-01) Route Notes French expedition on Ganesh VIIV - Autumn 2006 The team, led by Stefan Cieslar, had a … Paldor's east side and continued northward to GaneshVII,V, which is across the border in Tibet. Their attempt on GaneshVIIV was unauthorized; the mountain is not on the Nepalese government's list of permitted peaks.Primary ID GAN706301GAN506301 -
Changed PAND02301 (2002) — S Face/Ridge 2 fields
Field Before After Route 1 S FaceS Face/Ridge Success 2 TrueFalse -
Changed PAND15301 (2015) — NE Face from S 1 field
Field Before After Route 1 E Face from SNE Face from S -
Changed PANN09301 (2009) — NE Face (via 6150m col) 4 fields
Field Before After Route 1 NE FaceNE Face (via 6150m col) High Point (m) 64786150 Campsites BC(26/09,5128m),Smt(22/10)BC(26/09,5128m),xxx(22/10,6150m) Route Notes … rock, and finally a snow ridge with cornices. On 22 October the summit party left their … him at C1 to retrieve the camp's gear. [This ascent is disputed: see AAJ 88:64-71(2014)].(2014) and PANN-173-01.] Sherpas: Dawa Sherpa, 7/2/78 (25/10/2034), Tashigaon, Makalu-5, no … -
Changed PANN13301 (2013) — NE Face (direct) 1 field
Field Before After Route 1 NE FaceNE Face (direct) -
Changed PAWR15101 (2015) — E Ridge from S 1 field
Field Before After Route Notes Paulo Grobel (on TsarChaar Batsa Himal): [After leaving Manaslu] we then trekked to Larkya … Panbari, is a group of mountains including unclimbedTsarChaar Batsa Himal [Pawar Central] (6621m). Frank Bonhomme, Christian … -
Changed PBUK05301 (2005) — S side (intended) 1 field
Field Before After Route 1 South side (intended)S side (intended) -
Changed PK0415101 (2015) — SE Ridge 13 fields
Field Before After Route 1 S sideSE Ridge Approach -Num by road->Barun La->Makalu BC Basecamp Date -2015-04-06 Summit Date -2015-04-20 Summit Days 014 Total Days 016 Termination Date -2015-04-22 Termination Reason 1410 Termination Notes Abandoned due to earthquakeAbandoned about 6500m due to dangerous crevasses High Point (m) 06500 Camps 02 Campsites -BC(06/04,4800m),C1(18/04,5100m),Biv(19/04,6000m),xxx(20/04,6500m) Route Notes ThisLladoteamandmayRubihaveabandonedbeenattemptattemptingaroundthe6500m6287mduepeaktoneardangerousthe West Col that is now listed (incorrectly) by the Ministry as Peak 4.crevasses. -
Changed POKR09201 (2009) — N Face 1 field
Field Before After Route Notes Also had permit for Amotsang, but only attempted Pokharkan.Also had permit for Amotsang, but only attempted Pokharkang. -
Changed PUMO15304 (2015) — SE Face-E Ridge 1 field
Field Before After Agency On Bochi Bochi Treks permitBochi Bochi Treks permit -
Changed PUMO88304 (1988) — SW Ridge from W 1 field
Field Before After Route Notes … as such, further searches by myself seemed unjustifiable. I returned to Kathmandu with the helicopter and … Christian and have committed them into God's care. Note: The bodies of Runarsson and Gudjonsson were discovered at the bottom of a glacier in November 2018 by an American climber. -
Changed PUMO89102 (1989) — S Ridge 1 field
Field Before After Route Notes … running north from Kalapattar C3 on SW Ridge. Fixed 3000m rope on entire route because other … Japanese made route, Americans followed on same route. OthersOther members of this team not to top because not strong andsamesome snow fall.WasIt was a guided climb. -
Changed PUMO97307 (1997) — S Face (new route to S Pillar)(to 6250m) 2 fields
Field Before After Other Summits Climbed Lobuje East (LOBE-973-01) and Nuptse NW Smt (NUPT-973-02)Climbed Lobuje East (LOBE-973-01) and Nuptse NW Smt (NUPW-973-01) Primary ID -NUPW97301 -
Changed PUTH12307 (2012) — NE Face 1 field
Field Before After Agency Hi On Life HimalayaHi On Life Adventures -
Changed PUTH16303 (2016) — NE side 4 fields
Field Before After Termination Notes -Abandoned at 7160m due to coldness High Point (m) 07160 Total Hired 05 Campsites -BC,C1,C2,xxx(7160m) -
Changed PUTH16304 (2016) — NE side 1 field
Field Before After Agency Hi On Life HimalayaHi On Life Adventures -
Changed RAUN15301 (2015) — W Ridge-NW Ridge (Nima Tenji rte) 1 field
Field Before After Other Summits Summited Langdak on 5 Oct and Tarkargo East on 6 Oct by all three SherpasSummited Langdak on 5 Oct and Takargo East on 6 Oct by all three Sherpas -
Changed ROCN84301 (1984) — Glacier Dome-E Ridge (enroute to Annapurna I) 1 field
Field Before After Other Summits Climbed Annapurna I (ANN1-843-02), Annapurna I East Smt (ANNE-843-01) and Annapurna I Middle Smt (ANMN-843-02);(ANNM-843-02); traversed under summit of Glacier Dome(GLAC-843-03)(GLAC-843-02) -
Changed ROCN93301 (1993) — S Face 1 field
Field Before After Leaders Yoo Yee-SunYang Wha-Souk -
Changed ROLK16301 (2016) — S Ridge-SW Ridge from E 1 field
Field Before After Sponsor Team Japan Himalayan Camp Expedition 2016Team Japan Himalaya Camp Expedition 2016 -
Changed SALW16301 (2016) — S Face 2 fields
Field Before After Disputed TrueFalse Route Notes … after 20 rappels, duet got back to BC. It's the first ascent of the peak. The … is 1600m high with difficulties up to 6a/M5,6/AI4/90°. -
Changed SARI08301 (2008) — NE Face/Ridge 2 fields
Field Before After Other Summits Summited 6225m peak on Oct 12,12 (KARS-083-01), 6226m peak on Oct13,13 (aka Alfred's Belvedere), and Kumlung (KUML-083-01)Route Notes … led by Paulo Grobel - 26 Oct 2008 The Saribung summit party consisted of all members … climbed to the tops of two 6225 meter unnamedpeakspeaks(Sonam Himal and Karsang Kang) just north of Saribung in order to take … pm, were back in C2 at 2:00 pm. The Saribung summiters, Michel Cler, Le Disque, Milteau, … hour and returned to C2 at 2:00 pm. On the 12th, Le Disque and Milteau scaled one of the 6225m peaks(Kharsang(KarsangPeakKang or Sonam Himal) while Mary and Michel Cler … from which they would trek out via Phu. On the 13th, Grobel, Milteau, Pueyo and Stellato … -
Changed SIMN07101 (2007) — S Face 2 fields
Field Before After Primary Reference FalseTrue Primary ID -HIME07101 -
Changed SITA15301 (2015) 1 field
Field Before After Agency Cultural Treks & ExpeditionsCultural Treks -
Changed TAKN16301 (2016) — SW Ridge from E 1 field
Field Before After Route 1 E sideSW Ridge from E -
Changed TAWA08201 (2008) — SW Ridge 1 field
Field Before After Primary Reference FalseTrue -
Changed TAWO06401 (2006) — E Ridge 1 field
Field Before After Sponsor -American Tawoche Expedition Winter 2005-2006 -
Changed TAWO85401 (1985) — SE Face-SE Ridge 1 field
Field Before After Leaders Oh In-Hwan, Tamotsu OhnishiOh In-Hwan -
Changed TENR09301 (2009) — S Ridge 1 field
Field Before After Other Summits CLimbed ParchamoClimbed Parchamo -
Changed TENR12301 (2012) — N Ridge 2 fields
Field Before After Primary Reference FalseTrue Primary ID -LMOC12301 -
Changed THUL10301 (2010) — NW Face of Manaslu-NE Ridge of Thulagi 1 field
Field Before After Sponsor -Belarus-Russian Thulagi Expedition 2010 -
Changed THUL11101 (2011) — S Face 2 fields
Field Before After Leaders Nikolay BandaletBelarus Nikolay Bandalet 2011 Sponsor Thulagi ExpeditionBelarus Thulagi Expedition 2011 -
Changed TILI06305 (2006) — NE Spur-N Ridge 1 field
Field Before After Agency Cultural Treks & ExpeditionsCultural Treks -
Changed TLNG91101 (1991) — NW Face-W Face 1 field
Field Before After Other Summits Climbed Kangchenjunga (KANG-911-02), Kangchenjunga Central (KANC-911-01), Kangchenjunga South (KANS-911-01); attempted Jannu (JANU-911-01)(JANE-911-01) -
Changed TOBS08301 (2008) — N Face 1 field
Field Before After Route Notes … wall and ridge from north too difficult. Sherpas: LhakpaLakpa Nurbu, 19/7/77 (4/4/2034), Ekuwa, Pathibara, Sankhuwasabha, no 8000ers Pema Sherpa, 28/8/73 (12/5/2030), Ekuwa, Pathibara, no 8000ers … -
Changed TUKU05101 (2005) — NW Ridge 1 field
Field Before After Agency Friends AdventureFriends Adventure Team -
Changed TUKU12301 (2012) — S Ridge 1 field
Field Before After Agency Cultural Treks & ExpeditionsCultural Treks -
Changed TUKU87301 (1987) — NW Ridge 1 field
Field Before After Route Notes BC between Dhampus and French Passes on east side of start of ridge feeding NW Ridge C1 at junction of North and NW Ridge …