Expeditions changes
In the 2018-12-16 release release.
-
Changed LHOT13129 (2013) — S Col-SE Ridge-Everest Smt-W Face 1 field
Field Before After Sponsor -Indian Everest-Lhotse Expedition 2013 -
Changed LHOT14113 (2014) — W Face 1 field
Field Before After Nationality Hong KongChina -
Changed LHOT15111 (2015) — W Face 1 field
Field Before After Countries Australia, Hong Kong, LithuaniaAustralia, China, Lithuania -
Changed LHOT16114 (2016) — W Face 1 field
Field Before After Sponsor -Chinese Dream Lhotse Expedition 2016 -
Changed LHOT17107 (2017) — W Face 1 field
Field Before After Route Notes The Seven Summit Treks Lhotse expeditionExpedition was a combination of several independent teams (1-3 … individual acccounts for each team are given below: Song Yui-Jiang (China) Camps: BC(18/04,5300m),C1(28/04,6100m),C2(16/05,6400m),C3(17/05,7000m), C4(18/05,7781m),Smt(19/05) Left: 21/05/17 … the couloir, to pay attention to rock/ice falls. Gyelu Sherpa up to C3. Italians didn't want him to gofurther,farther, but to wait at C3. "Weather forecast always changing, particularly unstable conditions this … Sefland and Temba. Sherpa: Temba Bhote, Makalu, 19/03/82 Alessandra Pepper(Autralia)(Australia) Mariano Galvan (Argentina) Camps: BC(27/04,5300m),C2(6480m),C3(08/05,7200m),xxx(21/05,8015m) Left: 29/05/17 Hired: … -
Changed LHOT17108 (2017) — W Face 2 fields
Field Before After Sponsor Chinese 14 Peaks Lhotse ExpeditionChinese 14 Peaks Lhotse Expedition 2017 Summit Hired 21 -
Changed LHOT17111 (2017) — W Face via S Col 1 field
Field Before After Agency Sherpa Kangri OutdoorSherpa Khangri Outdoor -
Changed LHOT17113 (2017) — W Face 1 field
Field Before After Summit Hired 21 -
Changed LMOC12301 (2012) — NW Ridge 1 field
Field Before After Primary ID TENR12301- -
Changed LNJU16301 (2016) — NE side 1 field
Field Before After Other Summits Attempted Larke (6249m) by DupreAttempted Larkya Peak (6249m) by Dupre -
Changed LOBE14101 (2014) — E Face (new rte) 1 field
Field Before After Primary Reference TrueFalse -
Changed LOBE97301 (1997) — NE Face up, SE Ridge down 2 fields
Field Before After Other Summits Climbed Pumori (PUMO-973-07) and Nuptse NW Smt (NUPT-973-01)Climbed Pumori (PUMO-973-07) and Nuptse NW Smt (NUPW-973-01) Primary ID NUPT97301NUPW97301 -
Changed LUN210301 (2010) — SW Face 2 fields
Field Before After Sponsor -French Lunag Ri Expedition 2010 Camps 02 -
Changed MAKA08102 (2008) — Makalu La-NW Ridge 3 fields
Field Before After Total Hired 12 Summit Hired 12 Route Notes 21 April to BC, very cold higher &and went to get more gear. Sanchez never went above BC due to "stomach problems, food problem, many problems." Sherpa: Dawa Nuru Sherpa, 18/2/78 (7/11/2034), Thami Chhang Dawa Sherpa -
Changed MAKA11107 (2011) — Makalu La-NW Ridge (to 8200m) 1 field
Field Before After Other Summits Traversed entire Chago ridge (including summits)Traversed entire Chago ridge (including summits) (CHAG-111-01) -
Changed MAKA12104 (2012) — Makalu La-NW Ridge 1 field
Field Before After Route Notes Rao, Lhakpa [Thinduk],Lhakpa, Mingma, Pechhumbe and a Chinese woman [Luo Jing] … May Rao went to Lhotse BC by helicopter. Oxygen: Up: almost reaching C3 (7200m) began to … -
Changed MAKA12105 (2012) — Makalu La-NW Ridge 1 field
Field Before After Route Notes Rao, Lhakpa [Thinduk],Lhakpa, Mingma, Pechhumbe and a Chinese woman [Luo Jing] … day 12 May they went down to ABC. Oxygen: Up: almost reaching C3 (7200m) began to … -
Changed MAKA14115 (2014) — Makalu La-NW Ridge 1 field
Field Before After Sponsor Giripremi's Makalu 2014Giripremi Makalu 2014 -
Changed MAKA16105 (2016) — Makalu La-NW Ridge 1 field
Field Before After Route Notes … C4, where they arrived between 5 pm and 7pm.7 pm. On 24 May all members and Sherpas down to ABC. Good conditions. French Couloir mixed. Weather calm and … -
Changed MAKA16109 (2016) — Makalu La-NW Ridge 2 fields
Field Before After Campsites BC(15/04),C1(6500m),C2(7500m),Smt(23/05)BC(15/04),C1(21/05,6500m),C2(22/05,7500m),Smt(23/05) Route Notes BC 15/04 C1 21/05 6500m (normal C2) C222/05 7500m stayed a few hours for drink Smt 23/05 Confortola and Camandona at 11 am. Without oxygen and Sherpas. They left Makalu La on 22 May at … descended to Makalu La to sleep. Following dayBCto BC. Sophie Lavaud, who was on Andreas Neuschmied's expedition, … -
Changed MAKA17102 (2017) — Makalu La-NW Ridge 3 fields
Field Before After Summit Time -1018 Route Notes … Tashi from C3 to summit to C3. Sherpa: Nga Tashi, Yaphu-9, 04/10,1980 From Mingma's Facebook page: We reached Makalu fore summit at 9:03am on 11th May and I reached main summit at 10:18am. My partner Tashi and Jingxue (Chinese) reached at 10:48am after I put the final rope. Rope was not fix to main summit and we had to use our own 60m+20m main rope which we almost left at camp 3 after some people told it was fixed till Summit. Makalu wasn't easy mountain as I used to hear. I felt like it's completely nonsense to say Makalu is one of easy Peak among 8000m. Saulius Damaulevicius - 29 Oct 2018 Damaulevicius says that Gregory Attard as well as members of MAKA-171-02 only reached the foresummit and not main summit. Agency Dreamers Destinations TreksDreamers Destination Treks -
Changed MAKA17103 (2017) — Makalu La-NW Ridge 1 field
Field Before After Route Notes … jeep to Num, trekked to BC Camps: BC(01/05,4800m),ABC(02/05,5600m),C1(05/05,6400m),C2(06/05,6650m), C3(09/05,7450m),Smt(11/05,7600m)C3(09/05,7450m),Smt(11/05) Left: 13/05/2017 Hired: 1 Term: Success at 10:30 … Phurba Sherpa, Makalu, 18/01/80 (with Raphael Fenech Adami) Saulius Damaulevicius - 29 Oct 2018 Damaulevicius says that Gregory Attard as well as members of MAKA-171-02 only reached the foresummit and not main summit. Rudi Bollaert (Belgium) Appr: Tumlingtar, jeep to Num, … -
Changed MAKA17104 (2017) — Makalu La-NW Ridge 3 fields
Field Before After Nationality UKJapan Countries Ecuador, JapanEcuador, UK Route Notes ABC 21/04 5600m C1 24/04 6100m C2 29/04 6650m C3 08/05 7450m HPt 10/05 8445m by Gordon, Jarrin, Noubu,Nobuo, Castillo Lofthouse, Pemba Nuru at 9 am (they stopped on the false summit at the end of the French couloirsas the rope was not fixed). Gordon, Jarrin andNoubu,Nobuo, who were using oxygen, left C3 at midnight … in the couloirs. Straightforward climb. Gordon, Jarrin andNoubuNobuo caught up with Castillo Lofthouse just before the … up with them again just below the summit. They spent about 20 minutes on the false … Noubu and Castillo Lofthouse at 8 pm. Oxygen: Used from below C3 to high point to C2 by Gordon, Jarrin,NoubuNobuo and Pemba Nuru Castillo Lofthouse did not use oxygen. -
Changed MANA08303 (2008) — NE Face 1 field
Field Before After Agency Ticino Treks & ExpeditionsTicino Treks -
Changed MANA09306 (2009) — NE Face 1 field
Field Before After Leaders Robert CasserleyRob Casserley -
Changed MANA09308 (2009) — NE Face 1 field
Field Before After Summit Hired 56 -
Changed MANA10313 (2010) — NE Face 1 field
Field Before After Nationality Hong KongChina -
Changed MANA11317 (2011) — NE Face 1 field
Field Before After Route Notes The expedition sent five members and five Sherpas to the summit on 5 October, as follows: Cartwright, Masek and MorrellHorrell with Kami Nuru, Chhedar and Chhongba, left C4 … returned to C2 between 3:00 and 6:00 pm. Oxygen was used on their summit day by … C2. Hyrylainen and all Sherpas used none atall,all; non-summiter Ms. Mikhanovskaia also usednone,none as noted below, but non-summiter Owens was on … high point of 7800m and down to C2. Non-summiting members: Crampton went to 7300m on 4 … went down to BC the same day together. Ferro got to C2 on 2 October, but … capable of going higher. He turned around; hisfriend,friendFaluticom,Falutico turned around with him. Both descended to BC that day. Ms. Mikhanovskaia reached C4 with the summit group, … -
Changed MANA12343 (2012) — NE Face 1 field
Field Before After Sponsor -Polish Manaslu Expedition 2012 -
Changed MANA13310 (2013) — NE Face 1 field
Field Before After Route Notes … and Mingma Dorjee at 3 pm, Gagneret, Favre-Felix, Morel and Dawa Gyalgen at 11:30 am. Baronian reached 7950m; Meziani reached C4 (7400m). Summit … 7950m to top to 7800m by Beigbeder Sherpas: Dawa Gyalzen,Chaplung,Chheplung, Khumbu, 21/08/1987 Mingma Dorjee Sherpa, Makalu, Sankhuwasabha, (13/03/2024), Everest X12? -
Changed MANA13327 (2013) — NE Face 1 field
Field Before After Route Notes … Hirose, Imoto, Ishi, Ishizaki, Kadotani, Kadoya, Mitoro, Nakajima, Nukita, Okuda, Onodera, Oshiro, Pemba Gyalzen, NgimaNimaNuru,Nurbu, Pemba Nuru, Nima Kancha, Mingma Nuru, Tshering Wangchu, Ang Pemba, … by Sherpas Sherpas: Pemba Gyalzen/Geljen, Thami, Khumbu, 22/07/1969NgimaNimaNuruNurbu,(Nima Nuru), Tesho,Thamiteng, Khumbu,06/11/198120/02/80 Pemba Nuru, Thamiteng, Khumbu, 17/01/1977 [probably from Pare, … Dolakha, 29/01/1980 Jit Bahadur (Thile), Khare-5, Dolakha, 30/07/1978 Pemba Tenzing,Khumjung,Tesho, Khumbu,06/01/19885/9/91 Ang Kaji, Gorkhani-4, 31 years (no previous summits) -
Changed MANA14312 (2014) — NE Face 1 field
Field Before After Agency Cultural Treks & Expeditions (Snowy Horizon prmt)Cultural Treks (Snowy Horizon prmt) -
Changed MANA14317 (2014) — NE Face 1 field
Field Before After Agency Himalayan Treasure TrekkingHimalayan Treasure -
Changed MANA14318 (2014) — NE Face 1 field
Field Before After Agency Tendi Sherpa (on Snowy Horizon permit)Tendi Sherpa (Snowy Horizon permit) -
Changed MANA15308 (2015) — NE Face 1 field
Field Before After Route Notes … Tokusa, Pemba Geljen, Pemba Nuru at 6:30 am; Taguchi, NgimaNima Nurbu, Nima Kancha at 8 am. Izumi and Fuji reached C3 during their first … Khumbu, 22/7/96 Pemba Nuru (Kaila), Pare, Khumbu, 03/2/1973NgimaNima Nuru,Tesho,Thamiteng, Khumbu,06/11/198120/02/80 Nima Kancha, Pare, Khumbu, 19/7/75 -
Changed MANA15309 (2015) — NE Face 1 field
Field Before After Route Notes … on to C2, where he stayed the night. BogenschutzBogenschuetz and Libera reached 7850m on their summit attempt … where they rested and then descended to C1. Fessmann and Tuechler reached C4 on 1 Oct. … -
Changed MANA15312 (2015) — NE Face 1 field
Field Before After Agency Mount Treks NepalMount Treks -
Changed MANA15313 (2015) — NE Face 6 fields
Field Before After Summit Date 2015-09-252015-09-24 Summit Days 2423 Termination Notes Abandoned at 7200m due to slab avalanche danger and Sherpa crevasse fallAbandoned at 6750m due to slab avalanche danger and Sherpa crevasse fall High Point (m) 72006750 Campsites BC(01/09,4800m),C1(07/09,5600m),C2(10/09,6400m),C2(24/09,6750m),xxx(25/09,7200m)BC(01/09,4800m),C1(07/09,5600m),C2(10/09,6400m),C3(24/09,6750m),xxx Route Notes … base camp on the evening of the 23rd. A very strong Sherpa rope fixingrope-fixing team consisting of two Sherpas each from the … base camp. He is now back in Kathmandu. The following day another team's Sherpas were collecting … another beautiful peak next year and not her. Phil Crampton Carina Ahlqvist - 18 Jan 2018 For your questions I can only respond for Altitude Junkies that I was part of 2015. As I remember everyone in our whole team reached camp 3 at 6800 meter. We stayed over the night at camp 3 and Himex with Russell Brice team that were about 100-200 meter from us with the same summit attempt schedule. There was an avalanche between our camps in the night, but didn't come too close to our tents. It was very windy for Himex that were more exposed to the wind, but we were fine. According to my notes that I took on a daily basis it was September 24th on the way to camp 4 (which is the highest camp) that the Sherpa fell into the crevasse and then they came back again to go to a hospital in Kathmandu. No team member continued further by that time. It was only Sherpa fixing ropes that reached that crevasse. We were doing our attempt for the summit push together with Russell Brice and the Sherpa who fell into the crevasse was in his team. I don't remember his name though and only noted that he was from Russell's team, but not his name. I asked the question now to one of the Sherpa in our team that I still stay in contact, with but he has not yet responded. I would suggst you ask Russell for the name. Carina Ahlqvist - 19 Jan 2018 The Sherpa who fell Into the crevasse was Namgyal Sherpa from Himex, Russell Brice expedition. -
Changed MANA16308 (2016) — NE Face 1 field
Field Before After Sponsor Chinese 14 Peaks ExpeditionChinese 14 Peaks Manaslu Expedition 2016 -
Changed MANA16319 (2016) — NE Face 1 field
Field Before After Countries China, Hong KongChina -
Changed MANA16325 (2016) — NE Face 22 fields
Field Before After Nationality JapanItaly Leaders Ryuseki HiraokaDanilo Callegari Sponsor Ryuseki Expeditions Cho Oyu 2016Italian Manaslu Expedition 2016 Success 1 FalseTrue Approach -Dharapani->BC Basecamp Date -2016-09-11 Summit Date -2016-10-01 Summit Time -0930 Summit Days 020 Total Days 022 Termination Date -2016-10-03 Termination Reason 01 High Point (m) 08163 Camps 04 Total Members 41 Summit Members 01 Total Hired 30 No Hired FalseTrue O2 None FalseTrue Campsites -BC(11/09,4800m),C1(15/09,5700m),C2(21/09,6400m),C3(22/09,6900m),C4(30/09,7400m),Smt(01/10) Route Notes -Callegari started summit push on 1 Oct at 1:00am from C4. Good conditions, sun, strong wind in the night and when arrived sunshine. Weak wind in all day. Callegari was on the summit alone about 5-8 minutes, then back in C4 where he rested for about 2 hours and then back to C3 where he slept. Agency Mountain ExperienceClimbalaya -
Changed MANA16330 (2016) — NE Face 1 field
Field Before After Agency Mount Treks NepalMount Treks -
Changed MANA16401 (2016) — NE Face 1 field
Field Before After Agency Satori AdventureSatori Adventures -
Changed MANA17102 (2017) — NE Face 1 field
Field Before After Agency Satori AdventureSatori Adventures -
Changed MANA86301 (1986) — NE Face-E Ridge up; NE Face down 4 fields
Field Before After Other Summits -Summited Manaslu East Smt (7992m) Campsites BC(08/09,4400m),C1(19/09,5600m),C2(20/09/10,6400m),C3(24/10,7300m),Biv1(05/11,5500m),Biv2(06/11,6300m),Biv3(07/11,7280m),Biv4(08/11,7600m),Biv5(09/11,8000m),Smt(10/11)BC(08/09,4400m),C1(19/09,5600m),C2(20/09/10,6400m),C3(24/10,7300m);Biv1(05/11,5500m),Biv2(06/11,6300m),Biv3(07/11,7300m),Biv4(08/11,7700m),E.Smt(09/11,7992m),Biv5(09/11,8000m),Smt(10/11)Route Notes … on East Ridge Biv very near old C3. After BC established, every day rain so waited … in wind and snow. Ascent too slow so dowmdown to C2 on 29th to traverse to normal … via ridge clearing all camps as they went. 5th Nov final summit bid 3 members [Kukuczka, …Achievement -1st ascent of E Summit by Carsolio, Hajzer and Kukuczka -
Changed MANA88301 (1988) — NE Face 1 field
Field Before After Leaders Antoni Lopez De Haro, Francisco Soler i DiesAntoni Lopez De Haro, Francisco Soler Dies -
Changed MANA96102 (1996) — NE Face 1 field
Field Before After Achievement 1st Tibetan & Chinese attempt1st Tibetan and Chinese attempt -
Changed MUKT16301 (2016) — NW side 9 fields
Field Before After Basecamp Date -2016-09-26 Summit Date -2016-09-28 Summit Days 02 Total Days 04 Termination Date -2016-09-30 High Point (m) 06025 Camps 01 Campsites -BC(26/09),C1(28/09,6110m),xxx(6025m) Route Notes -Team trekked in to BC via Pokhara, Beni, Marpha and Dhampus Pass BC arriving at the Jomsom side BC on 26 Sept. C1 (at Mukut Pass) was established at 6110m. Grobel and Rajan Bhote went up to 6025 to examine the route. But due to bad weather the team did not succeed to climb Mukut Himal, but traversed Mukot Pass to the Dolpo side with a descent to Mu and a return in Upper Dolpo to Jomsom via Chharka and Sangda. -
Changed NGOR16301 (2016) — S Ridge 3 fields
Field Before After Total Members 12 Other Summits -Summited Nagoru West (6075m) on 30 Oct 2013 by Drexler and Lawang Tamang; summited Nagoru East (6116m) on 1 Nov 2013 by Drexler, Birgit Walk and Lawang Tamang (1st ascent) Route Notes … West (6075m) on 30 Oct 2013 (1st ascent). Drexler, Birgit Walk and Lawang Tamang summited Nagoru East (6116m) on 21 Nov 2013 (1st ascent). -
Changed NILN62301 (1962) — N Face-W Ridge 1 field
Field Before After Route Notes … G. Egeler - physics, geology, University of Amsterdam Dr. T. De BooyBooij - staff geological institute of University of Amsterdam 2 physicians will do some physiological work on …