Expeditions changes
In the 2022-12-01 release release.
-
Added TILI21101 (2021)
-
Added TUKU21101 (2021)
-
Changed AMAD03316 (2003) — SW Ridge 1 field
Field Before After Summit Time -1200 -
Changed AMAD09343 (2009) — SW Ridge 2 fields
Field Before After No Hired TrueFalse Route Notes … the 10th and left the following day. Sherpa: Ang Pasang Sherpa, 11/2/76,11/2/66, Pangboche, Everest X3, Cho Oyu X4 -
Changed AMAD12320 (2012) — SW Ridge 1 field
Field Before After No Hired TrueFalse -
Changed AMAD12322 (2012) — SW Ridge 1 field
Field Before After No Hired TrueFalse -
Changed AMAD13319 (2013) — SW Ridge 1 field
Field Before After Route Notes … on 28 Nov. From Seven Summit Treks website: Congratulations to all the summit team of M/S … Pemba Sherpa, Mr. Mingma Dorchi Sherpa and Mr. ChejiChhiji Nurbu Sherpa and most important the 05 Chinese … -
Changed AMAD16301 (2016) — SW Ridge 1 field
Field Before After Sponsor Sherpa Rope-Fixing Team 2016Sherpa Rope-Fixing Ama Dablam 2016 -
Changed AMAD16331 (2016) — SW Ridge 1 field
Field Before After Sponsor Top Himalaya Guides Ama Dablam Expedition 2016Top Himalaya Guides (THG) Ama Dablam Expedition 2016 -
Changed AMAD17346 (2017) — SW Ridge 1 field
Field Before After No Hired TrueFalse -
Changed AMAD17348 (2017) — SW Ridge 1 field
Field Before After Sponsor Top Himalaya Guides Ama Dablam Expedition 2017Top Himalaya Guides (THG) Ama Dablam Expedition 2017 -
Changed AMAD17353 (2017) — SW Ridge 3 fields
Field Before After Summit Date 2017-11-012017-11-02 Summit Time -0855 Campsites BC,C1,C2,Smt(01,03-04,15-16/11)BC,C1,C2,Smt(02-04,15-16/11) -
Changed AMAD18327 (2018) — SW Ridge 2 fields
Field Before After Sponsor Elite Himalayan Adventures Ama Dablam Expedition 2018Elite Exped Ama Dablam Expedition 2018 Agency Elite Himalayan Adventures (Himalayan Guides pmt)Elite Exped (Himalayan Guides pmt) -
Changed AMAD18340 (2018) — SW Ridge 1 field
Field Before After Sponsor Top Himalaya Guides Ama Dablam Expedition 2018Top Himalaya Guides (THG) Ama Dablam Expedition 2018 -
Changed AMAD19301 (2019) — SW Ridge 2 fields
Field Before After Total Hired 34 Summit Hired 34 -
Changed AMAD19307 (2019) — SW Ridge 1 field
Field Before After Leaders Esteban MenaTopo Mena -
Changed AMAD19311 (2019) — SW Ridge 1 field
Field Before After Total Hired 21 -
Changed AMAD19314 (2019) — SW Ridge 7 fields
Field Before After Summit Date 2019-11-232019-11-24 Summit Time 10000930 Summit Days 34 Total Days 07 Termination Date -2019-11-27 Campsites BC(20/11,4600m),C1(21/11,5850m),C2(22/11,6100m),Smt(23-25/11)BC(18/11,4600m),C1(21/11,5850m),C2(22/11,6100m),Smt(24-25/11) Route Notes Notes from FB pages:pages [and Ministry files]:2324 Nov - Martin [Brannelly], Jon [Gupta] and Dorje summited just before 10. 25 Nov - Jon Gupta, Kate [Hallam] and … -
Changed AMAD19315 (2019) — SW Ridge 1 field
Field Before After Sponsor Tim Mosedale's Ama Dablam Expedition 20189Tim Mosedale's Ama Dablam Expedition 2019 -
Changed AMAD19330 (2019) — SW Ridge 1 field
Field Before After Sponsor Seven Summit Treks (SST) Ama Dablam Expedition 2019Seven Summit Treks Ama Dablam Expedition 2019 -
Changed AMAD19331 (2019) — SW Ridge 1 field
Field Before After No Hired TrueFalse -
Changed AMAD19332 (2019) — SW Ridge 1 field
Field Before After Agency Elite Himalayan Adventures (Seven Summit Trks pmt)Elite Exped (SST pmt) -
Changed AMAD19345 (2019) — SW Ridge 1 field
Field Before After Agency Pioneer Adventure permitPioneer Adventure -
Changed AMAD19353 (2019) — SW Ridge 6 fields
Field Before After Nationality USANepal Leaders Matthew HookTshering Palden Bhote Sponsor Top Himalaya Guides Ama Dablam Expedition 2019Top Himalaya Guides (THG) Ama Dablam Expedition 2019 Countries Ireland, Spain, UKIreland, Spain, UK, USA Total Members 56 Total Hired 87 -
Changed AMAD19402 (2019) — SW Ridge 1 field
Field Before After Route Notes … went home, and Pemba Sherpa joined the group. In the morning 1/28, we left the abandonment … 5, we started the descent into the valley. Report from Alex Goldfarb - 9 Feb 2020 Final update on Winter Lobuche-Ama Dablam Expedition Dear friends, we are on the on the way to warmth and civilization, arrived to Kathmandu yesterday. Our adventure is over to the most extent. This expedition idea was conceived in a warm office, in Cambridge, Massachusetts. Winter climbing being an additional step up to usual challenges to high altitude expedition. It always interesting to me how the idea that initially is called crazy, all of the sudden attracts attention, gets traction, expands, gets involved more people and all of the sudden the wheels are rolling, people are involved, the definition "crazy" is pushed to periphery and things are moving ahead. At some point even if you want to jump the train - it is too late. Winter climbing introduces more difficulties, mostly cold and weather related, but also lack of usual infrastructure in the winter, different condition of snow and ice, different physiological demands of the body. Last year a group of climbers including some of my friends planned to climb K2 in the winter, unbelievable project, that is yet to get materialized. The more I thought about it, the more I wanted to try climbing in the winter. Winter Ama Dablam popped up in my head, and the more I thought about it, the more I got fascinated. Also, when I thought about a partner, I immediately contacted my friend Zoltan Szlanko and within minutes received enthusiastic "Yes!". Than it was time to figure out our strategy, logistics, dates, talk to people at work, etc. Now our expedition is pretty much over, we are now back in Kathmandu; it is hard to imagine it has been over three weeks in the mountains, although thinking of some of the events - they seem very far in the past, like in another life. It was a successful, aggressive and relatively fast climb. We started by walking up the Khumu valley from Lukla on January 16. On 1/19 we got to Thyangboche, next day we went to Dingboche, weather improved, became clear (after we had lots of rain/snow at the beginning). On the 1/21 we got to Lobuche, it was way colder there than down in the valley. We thought we would need a little more acclimatization before attempting the summit of the Lobuche East and decided to trek up to the top of Kalapattar (5550m) on 1/22 and then back to Lobuche, where we spent the next day for rest. On the 24th, led by Ngawang Sherpa we walked to Lobuche East high camp, about 4-5 hours up from Lobuche, set the camp, sorted out things and next morning 1/25 started climbing Lobuche East at about 4 am in the dark. Climbing this mountain was a challenge, added by cold and wind (though generally the weather was reasonable). We started at 4 am and got to the summit few hours later. It was a tiring climb, cold and windy. After coming back to high camp we relaxed for maybe 15-20 minutes, then broke down the camp and hiked to Tukla for a couple of hours. Next day (1/26), from Tukla to Pangboche, and the day after (1/27) to Ama Dablam base camp. At this point Ngawang Sherpa went home and Pemba Sherpa joined the group. On the morning on 1/28 we took a load to slightly below Camp 1 and went back to base camp, next day - rest. On 1/30 we started our summit push, went from base camp to Camp 1, next day from Camp 1 to Camp 2, main challenge being the "Yellow Tower." On February 1 we got from Camp 2 to Camp 3, very steep climb, thin ridge and a lot of wind. At this point Zoltan got a lot of wind exposure on the ridge as we were moving pretty slow, he got really sick in the evening with shaking chills and could not warm up. Because the summit attempt was planned for the next morning February 2 starting out of the camp at 4 am, it is very unfortunate that he could not participate in it. Pemba Sherpa and I (Alex) got up at 2:30 am and left the camp around 4. It is a steep climb with lots of wind and cold exposure. We were at the summit at 10:27 am, it is very windy, we took a few pictures and hurried down. After spending another night at camp 3 we got up in the morning of February 3, broke down the camp and went down to base camp. It was a very long day, we came to base camp in the dark, it feels very good to be back to safety. We took a day of rest on February 4 to dry and sort out things, repackage, and February 5 (happy birthday to me!) started going down the valley. We want to thank many people who made our expedition a success. First and foremost, Gurla Mandata Trekking, and personally to Pasang for incredible organization of the logistics, supplies, and every other aspect of this project. We are incredibly grateful to Pemba Sherpa, our unbelievable guide to Mt. Ama Dablam. We are grateful to Nepalese Ministry of Tourism for support and motivation. We very much thank our sponsors (see lists of sponsors below), financial support was crucial for this project. We were very lucky to overlap on the mountain with Alex Txikon's expedition and to meet him briefly. The fact that their team fixed the ropes on the mountain was critical to our success, we never had a chance to say thank you in person, since they left to climb Everest by the time we god back to base camp. I (Alex Goldfarb) personally want to thank Miguel Fernandez (of the same Barcelona team), who, after my down suite fell off the mountain for 2000 meters; let me use his. Without this warm full body down suite one should not even attempt to climb Ama Dablam in the winter. And of course a huge thank you to our families, kids, parents, all relatives and friends, who let us do these crazy things. We are very grateful to those who provided information support (Elena Laletina and Laszlo Pinter) and those who followed our climb, without your interest and attention things would be completely different. Everything was happening we hope, with the help and support of G-D, and we observed small miracles on the daily basis, we are grateful to G-D for our success. And few final words. I will try to be deep and profound :-). I think it was Edmund Hillary, who said something to the effect "We do not conquer the mountains we conquer ourselves." Mountain is a piece of rock, it is indifferent to you, it does not care, if you feel like you conquer anything, you are fool. Similar to running marathon or an ultra, the whole point is - you want to know what YOU are capable of, learn your limits, and move them outward. You conquer yourself of yesterday, yourself that is weaker, that is what you want to conquer and leave in the past. And also, paraphrasing Walter White in the last episode of "Breaking Bad" - All that I did - I did it for me, I liked it, I felt alive, I thought I am really good at it (not a direct quote, I have no way to verify right now). What we do in the mountains - we mostly do for ourselves, it is a great feeling of direct visible goal, of personal expertise, challenge, tapping into personal experience, feeling of freedom, clear personal identity beyond artificial social layers and bullshit, feeling alive, young and capable. Of course we want to impress girls, of course public interest and attention are exciting. But ultimately, if you don't realize that climbing mountains is done for yourself - you might be missing on the most important part of it. We now come home with many stories, pictures and videos, but how can you transmit the whole experience to someone who is asking "how was it?" How do you explain cold and wind, and altitude and fear, and desperation, and giving up and at the last moment not giving up, and tears, and crying, and pain, and dehydration, and feeling sick, but also friendship, joy, beauty, and sense of accomplishment, strength, and warm sleeping bag at the end of the day, relationships free of bullshit, freedom, feeling strong, young and alive. This is something that will be left with us, as any other life experience, it makes us the men were are. -
Changed AMAD90405 (1990) — SW Ridge 1 field
Field Before After Route Notes BC near BC (normal site). Had many camps because of taking a lot of equipment &and slow progress on bare rock (problem for making … -
Changed AMAD98318 (1998) — SW Ridge 1 field
Field Before After Route Notes BC at normal site - 130 tents at one time. 21 Oct summit team went to top from … out on route and Kellogg very fast athlete. 23rd Oct from C3: Spitalny, Kili Sherpa and Dorje Sherpa at 11:30 am.25th Oct from C3: just before noon all … to BC same day (others slept at C3). * [possibly a record speed climb: Russell Brice faster] -
Changed ANN109105 (2009) — N Buttress-N Face 1 field
Field Before After Route Notes Sherpas: ChhitjeeChhiji Nurbu Sherpa, 30/7/1980 (15/04/2037), Sedua, Makalu-9, Ever 8/5/08 summited Makalu with Kim. Phurba Ongel Sherpa, 30/7/81 … X3, Pumori??] Pemba Sherpa, 28/2/80 (16/11/2036), Sedua, Makalu-9 According to emails of Kang, apparently Kang,ChhitjiChhiji Nurbu and Phurba Ongel left C3 at 10 … to C3 in 8 hours (at 7 pm). Other member's high points were Kim Cha-Nyun 5100m … -
Changed ANN109304 (2009) — N Face (Dutch Rib) 1 field
Field Before After Route Notes Miss Oh's first attempt started on 17 October after spending two nights at ABC with Chhitjee,Chhiji Nurbu, Pema and Pasang. They had to turn around … to deep snow, one and half meters deep. On the second attempt Oh started from 6800m, … between C2 and C3 with Cheong, Pema, Dawa,ChhitjeeChhiji Nurbu and Pasang at 11:53 am on 2 October. … descend to ABC and next day to BC. The team left BC by helicopter to Pokhara … Mathilow, Walung, Makalu-9, Kangch X4, Everest X3, etc.ChhitjeeChhiji Nurbu, 30/7/80 (15/04/2037), Upper Walung, Makalu-9, Makalu X1, Annapurna I X1 Pasang Tenzing/Tenji, 12/10/08 (10/08/2038), Upper Walung, Manaslu X1 -
Changed ANN110105 (2010) — N Face 1 field
Field Before After Route Notes … Pasaban's ropes were buried under the new snow. On the 27th the summit party left C4 … with three Sherpas, Dawa Wangchuk, Pema Tshering and ChhitjeeChhiji Nurbu. From their low C4, they needed 13 … the farthest left (east) bump on the top. Miss Oh said when she was on the … waited for tea to be brought to her. On the 28th, the three Korean summiters and … Sherpa summiters spent the night in C1, whileChhitjeeChhiji Nurbu descended to BC. On the 29th, everyone … remained for two days before returning to Kathmandu. Oxygen: Miss Oh and the three Sherpas used … the top to but not in C4. Sherpas:ChhitjeeChhiji Nurbu, 30/7/80 (15/4/2037), Upper Walung, Makalu-9, Annapurna I X1, Makalu X1 Dawa Wangchuk, 17/12/72 (3/9/2029), Mathilow, Walung, … -
Changed ANN112113 (2012) — N Face 1 field
Field Before After No Hired TrueFalse -
Changed ANN115106 (2015) — N Face 1 field
Field Before After No Hired TrueFalse -
Changed ANN116103 (2016) — N Face 1 field
Field Before After Route Notes … and contracted for by each team. The individual acccountsaccounts for each team are given below. Two summit attempts were made by group members: … hence the later date for sleeping in C1. Luo Jing andChhitjeeChhiji Nurbu Sherpa started their summit from high C4 … minutes, then descended to C3 at 4 pm. Straightforward climb. No fixed rope above 7500m. On … Luo Jing from C4 to summit to C3.ChhitjeeChhiji Nurbu from C4 to summit to C4. Sherpa:ChhitjeeChhiji Nurbu Sherpa, Upper Walung, Makalu Barun, 30/07/1080 Boyan Petrov (Bulgaria) Name: None Camps: BC(16/03,4200m),C1(18/03,5100m),C2(19/03,5600m),C3(13/04,6500m), C4(14,29/04,7000m),Smt(30/04) … -
Changed ANN119101 (2019) — N Face (Dutch Rib) 1 field
Field Before After Route Notes … and contracted for by each team. The individual acccountsaccounts for each team are given below. Rope-fixing team Mingma David Sherpa Gesman Tamang Gyalje … -
Changed ANN257101 (1957) 1 field
Field Before After No Hired TrueFalse -
Changed ANN417301 (2017) — NW Ridge 4 fields
Field Before After Termination Notes Abandoned at 6475m5920m due to uncertainty about route to from C2 to C3 and extremely cold weatherHigh Point (m) 64755920 Campsites BC(27/10,4700m),C1(04/11,5640m),C2(08/11,6475m),xxxBC(27/10,4700m),C1(04/11,5640m),C2(08/11,5920m),xxx Route Notes … was approximately 14 hours - HC to HC. After our successful Chulu West summit, we moved … and establish up to Camp 2 at approximately 21,00019,400 ft. The team of 3 (Darryl, Lhakpa, and … possible routes to the dome of Camp 3. Arriving at BC we had 2-6 inches of … -
Changed BAMO10301 (2010) — S Face 1 field
Field Before After No Hired TrueFalse -
Changed BARU09101 (2009) — SE Ridge 1 field
Field Before After Route 1 SE RdgeSE Ridge -
Changed BARU09102 (2009) — SE Ridge 1 field
Field Before After Route 1 SE RdgeSE Ridge -
Changed BARU09103 (2009) — SE Ridge 1 field
Field Before After Route 1 SE RdgeSE Ridge -
Changed BARU09106 (2009) — SE Ridge 1 field
Field Before After Route 1 SE RdgeSE Ridge -
Changed BARU09301 (2009) — SE Ridge 1 field
Field Before After Route 1 SE RdgeSE Ridge