Tengkangpoche | 2025 E Ridge from N

A Slovenia expedition to Tengkangpoche in 2025 via E Ridge from N, led by Urh Primozic. Summit reached on 14th October 2025. 2 members recorded.

Expedition Details

Change history — how this expedition, its members and references have changed between database releases.

Field Value
ID 11679
Imported 2026-11-04 22:32:23.994980
Expedition ID TKPO25301
Peak ID TKPO
Year 2025
Season 3
Host Country 1
Route 1 E Ridge from N
Route 2 -
Route 3 -
Route 4 -
Nationality Slovenia
Leaders Urh Primozic
Sponsor Slovenian Tengkangpoche Expedition 2025
Success 1 False
Success 2 False
Success 3 False
Success 4 False
Ascent 1 -
Ascent 2 -
Ascent 3 -
Ascent 4 -
Claimed False
Disputed False
Countries -
Approach -
Basecamp Date 2025-09-25
Summit Date 2025-10-14
Summit Time -
Summit Days 19
Total Days 21
Termination Date 2025-10-16
Termination Reason 10
Termination Notes Abandoned circa 6200m due to route difficulty
High Point (m) 6200
Traverse False
Ski False
Paraglide False
Camps 2
Fixed Rope (m) 0
Total Members 2
Summit Members 0
Member Deaths 0
Total Hired 0
Summit Hired 0
Hired Deaths 0
No Hired True
O2 Used False
O2 None True
O2 Climb False
O2 Descent False
O2 Sleep False
O2 Medical False
O2 Taken False
O2 Unknown False
Other Summits -
Campsites BC(25/09,5100m),Biv1(12/10,5500m),Biv2(13/10,5900m),xxx(14/10,c6200m)
Route Notes • Sep 20: flight Ljubljana-Kathmandu • Sep 21: arranging permits at the ministry • Sep 22: flight to Lukla, walking Lukla-Phakding • Sep 23: walking Phakding-Namche • Sep 24: walking Namche-Thame • Sep 25: acclimatization at 5100m • Sep 26: boulder climbing at the base • Sep 27: climb under the Tengkanpoche wall, sleeping at 4500m • Sep 28: descent to the base • Sep 29: Matic rests, Urh at 4500m • Sep 30: visit to the hydroelectric power plant • 1–4 Oct: bad weather • Oct 05: acclimatization at 4000m, descent to base • Oct 06: acclimatization at 4200m, descent to base • Oct 07: approach under the N wall of Tengkangpoche, sleep at 4500m • Oct 08: traverse under the NW Kongde Ri Nup, sleep at 4900m • Oct 09: descent to base • Oct 10: rest • Oct 11: approach under the NW wall of Kongde Ri Nup • Oct 12: climbing the gap between Kongde Ri Nup and Tengkangpoche, bivy at 5500m • Oct 13: climbing to the top of the wall, bivouac on the ridge (5900m) • Oct 14: attempt to climb the summit, descent to base along the climbed route • Oct 15: rest • Ocr 16-18 Oct: walking Thame-Lukla • Oct 19: sleeping in Kathmandu • Oct 20: Flight Kathmandu - Ljubljana
Accidents -
Achievement -
Agency Dream Himalaya Adventures
Commercial Route False
Standard Route False
Primary Route False
Primary Member False
Primary Reference False
Primary ID -
Checksum 2465958
Year 2025
Summit Success False
O2 Summary None
Route (lowercase) e ridge from n

Members

2 recorded members.

Name Sex Year of Birth Citizenship Status Residence Occupation
Urh Primozic M 2000 Slovenia Leader - - Details Other expeditions
Matic Primozic M 2005 Slovenia Climber - - Details Other expeditions

References

0 recorded references.