Pumori | 2003 W Face
A France expedition to Pumori in 2003 via W Face, led by Frederic Bernard. Summit reached on 14th October 2003. 3 members recorded.
Expedition Details
| Field | Value |
|---|---|
| ID | 4506 |
| Imported | 2026-03-06 18:04:49.359634 |
| Expedition ID | PUMO03303 |
| Peak ID | PUMO |
| Year | 2003 |
| Season | 3 |
| Host Country | 1 |
| Route 1 | W Face |
| Route 2 | - |
| Route 3 | - |
| Route 4 | - |
| Nationality | France |
| Leaders | Frederic Bernard |
| Sponsor | Pumori 2003 |
| Success 1 | False |
| Success 2 | False |
| Success 3 | False |
| Success 4 | False |
| Ascent 1 | - |
| Ascent 2 | - |
| Ascent 3 | - |
| Ascent 4 | - |
| Claimed | False |
| Disputed | False |
| Countries | Switzerland |
| Approach | - |
| Basecamp Date | 2003-10-10 |
| Summit Date | 2003-10-14 |
| Summit Time | - |
| Summit Days | 4 |
| Total Days | 11 |
| Termination Date | 2003-10-21 |
| Termination Reason | 5 |
| Termination Notes | Abandoned at 6400m due to wind and bad snow conditions for ski descent |
| High Point (m) | 6400 |
| Traverse | False |
| Ski | False |
| Paraglide | False |
| Camps | 2 |
| Fixed Rope (m) | 600 |
| Total Members | 2 |
| Summit Members | 0 |
| Member Deaths | 0 |
| Total Hired | 1 |
| Summit Hired | 0 |
| Hired Deaths | 0 |
| No Hired | False |
| O2 Used | False |
| O2 None | True |
| O2 Climb | False |
| O2 Descent | False |
| O2 Sleep | False |
| O2 Medical | False |
| O2 Taken | False |
| O2 Unknown | False |
| Other Summits | - |
| Campsites | BC(10/10,5300m),C1(11/10,5800m),C2(14/10,6400m),xxx(14/10,6400m) |
| Route Notes | BC at bottom of South Face C1 at 5800m Kangri Shar Glacier on west side of Pumori High point at 6400m at C2. First acclimatization on Island Peak just above BC. C1 on glacier 500m west of face because too dangerous from avalanche at bottom of face (avalanche from big serac which route went around). Fixed rope from serac to C2 for Sherpa to come up with C2 gear and descend; fixed 200m just before and around serac and 400m above serac to C2. Then down to BC for rest on 15th to C2 19th and that night big wind blew up and sirdar decided to go down to BC and climb finished because of wind and snow conditions not good for ski descent, the purpose of this climb between 14 and 18 Oct. Weather changed with temperature drop and wind strong, so now good snow on face became frozen and transformed into 30 cms high pinnacles all over face. Casartelli came with Bernard only as film-maker and climbed only to 5680m at start of SW Ridge advantage point from which to photograph Bernard climbing. |
| Accidents | Sherpa slight altitude sickness |
| Achievement | - |
| Agency | Great Himalayan Adventure (GHA) |
| Commercial Route | - |
| Standard Route | - |
| Primary Route | False |
| Primary Member | False |
| Primary Reference | False |
| Primary ID | - |
| Checksum | 2456325 |
| Year | 2003 |
| Summit Success | False |
| O2 Summary | None |
| Route (lowercase) | w face |
Members
3 recorded members.
| Name | Sex | Year of Birth | Citizenship | Status | Residence | Occupation | |
|---|---|---|---|---|---|---|---|
| Frederic Bernard | M | 1968 | France | Leader | Chamonix, Haute-Savoie, France | Alpine guide | Details Other expeditions |
| David Casartelli | M | 1969 | Switzerland/France | Cameraman | Chamonix, Haute-Savoie, France | Computer-design engineer | Details Other expeditions |
| Nima Nuru Sherpa | M | 1967 | Nepal | H-A Worker | Chheplung, Khumbu | - | Details Other expeditions |
References
0 recorded references.