Pumori | 2000 SE Face/Ridge-E Col

A Germany expedition to Pumori in 2000 via SE Face/Ridge-E Col, led by Zbigniew Mlynarczyk. Summit reached on 16th October 2000. 13 members recorded.

Expedition Details

Field Value
ID 3737
Imported 2026-03-06 18:04:49.359634
Expedition ID PUMO00303
Peak ID PUMO
Year 2000
Season 3
Host Country 1
Route 1 SE Face/Ridge-E Col
Route 2 -
Route 3 -
Route 4 -
Nationality Germany
Leaders Zbigniew Mlynarczyk
Sponsor DAV Summit Club Pumori Expedition
Success 1 True
Success 2 False
Success 3 False
Success 4 False
Ascent 1 130
Ascent 2 -
Ascent 3 -
Ascent 4 -
Claimed False
Disputed False
Countries Austria, Switzerland
Approach -
Basecamp Date 2000-10-01
Summit Date 2000-10-16
Summit Time 1245
Summit Days 15
Total Days 19
Termination Date 2000-10-20
Termination Reason 1
Termination Notes -
High Point (m) 7138
Traverse False
Ski False
Paraglide False
Camps 2
Fixed Rope (m) 1600
Total Members 11
Summit Members 3
Member Deaths 0
Total Hired 2
Summit Hired 2
Hired Deaths 0
No Hired False
O2 Used False
O2 None True
O2 Climb False
O2 Descent False
O2 Sleep False
O2 Medical False
O2 Taken False
O2 Unknown False
Other Summits -
Campsites BC(01/10,5300m),C1(03/10,5800m),C2(06/10,6200m),Smt(16/10)
Route Notes BC 100m above Kalapattar at south end of avalanche area C1 on ridge on SE Face C2 on top of ridge. Put fixed rope "quite high" up to 7000m. Attempted summit 2 times unsuccessfully. Problem with big crevasse and avalanche slope on 9th and crevasse here and 12th avalanche problem on slope. In successful attempt found way towards left end of crevasse where was good ice-snow bridge and not so wide. Put 100m rope here. 16th summit bid by 4 members and 2 Sherpas starting at 4:00 am. Dressen turned back at 6400m because feet cold, while others went to top at 12:45 and 1:20 pm and returned to C2 about 4:30 pm together. C2 at 6200m is slightly low, but if make camp at East Col and then it snows, can be trapped there. Leader fixed much rope. Big serac hanging over C2 at 6600-6700m on East Ridge. Going to top you climb behind this serac, but it can be dangerous for those below.
Accidents Nothing except chest problem for kitchen boy
Achievement -
Agency International Trekkers (Intrek Asia)
Commercial Route False
Standard Route False
Primary Route False
Primary Member False
Primary Reference False
Primary ID -
Checksum 2455229
Year 2000
Summit Success True
O2 Summary None
Route (lowercase) se face/ridge-e col

Members

13 recorded members.

Name Sex Year of Birth Citizenship Status Residence Occupation
Norbert Bannert M 1960 Austria Climber Vienna, Austria Systems engineer Details Other expeditions
Bernhard Josef Bidmon M 1953 Germany Climber Goeppingen, Baden-Wuerttemberg, Germany Gardener Details Other expeditions
Alexander Dressen M 1975 Germany Climber Stadbergen, Bavaria, Germany Chemical labaratory staff Details Other expeditions
Joachim Herrmann M 1953 Germany Climber Rueckholz, Bavaria, Germany Insurance consultant Details Other expeditions
Zbigniew Mlynarczyk M 1956 Germany Leader Mittenwald, Bavaria, Germany Alpine guide Details Other expeditions
Joerg Nabitz M 1957 Germany Climber Waldshut-Tiengen, Baden-Wuerttemburg, Germany Auto mechanic Details Other expeditions
Angelo Vedani M 1952 Switzerland Climber Basel, Switzerland Professor of pharmaceutical chemistry Details Other expeditions
Rainer Vielberth M 1946 Germany Climber Zeitlarn, Bavaria, Germany Carpenter Details Other expeditions
Alfred Virant M 1941 Austria Climber Vienna, Austria Technician Details Other expeditions
Josef Winkler M 1962 Austria Climber Abtenau, Salzburg, Austria Technician Details Other expeditions
Robert Winklhofer M 1954 Germany Climber Bayerisch Gmain, Bavaria, Germany Building heating technician Details Other expeditions
Chhiring Dorje Sherpa M 1974 Nepal H-A Worker Beding, Dolakha - Details Other expeditions
Nawang Zimba Sherpa M 1955 Nepal H-A Worker Beding, Dolakha - Details Other expeditions

References

0 recorded references.