Phu Kang | 2008 S Ridge

A Switzerland expedition to Phu Kang in 2008 via S Ridge, led by Gerard Tejedor. Summit reached on 16th October 2008. 6 members recorded.

Expedition Details

Field Value
ID 6280
Imported 2026-03-06 18:04:49.359634
Expedition ID PHUK08301
Peak ID PHUK
Year 2008
Season 3
Host Country 1
Route 1 S Ridge
Route 2 -
Route 3 -
Route 4 -
Nationality Switzerland
Leaders Gerard Tejedor
Sponsor Swiss Phu Kang Expedition 2008
Success 1 False
Success 2 False
Success 3 False
Success 4 False
Ascent 1 -
Ascent 2 -
Ascent 3 -
Ascent 4 -
Claimed False
Disputed False
Countries France
Approach Besisahar->Jagat->Dharapani->Koto->Dharmashala->Kayang->Phu
Basecamp Date 2008-10-16
Summit Date 2008-10-16
Summit Time -
Summit Days 0
Total Days 16
Termination Date 2008-11-01
Termination Reason 12
Termination Notes Abandoned due to inaccessible route to the mountain
High Point (m) 4600
Traverse False
Ski False
Paraglide False
Camps 0
Fixed Rope (m) 0
Total Members 6
Summit Members 0
Member Deaths 0
Total Hired 0
Summit Hired 0
Hired Deaths 0
No Hired True
O2 Used False
O2 None True
O2 Climb False
O2 Descent False
O2 Sleep False
O2 Medical False
O2 Taken False
O2 Unknown False
Other Summits Climbed Himlung (HIML-083-08) (no permit)
Campsites BC(16/10,4600m)
Route Notes BC at 150m above the river and 200m below the Himlung BC. Swiss Phu Kang Expedition 2008 Autumn On 16 October Addor, Blanchard and Tejedor went up along the river to the place where the team originally planned to put up in BC near the lake at 4900m to see the route to Phu Kang. They could not find any possible access to Phu Kang from that area and returned to BC same day. On 17 October Addor, Blanchard, Ms Bonard, Ms Jacquemettaz, Krugel and Tejedor climbed up to C1 (5500m) of Himlung to observe once again the probable route along the glacier and returned to BC. On 25 October Addor, Blanchard and Krugel went to C1 of Himlung and slept there. On 26 October they climbed to C2 (6200m) and slept there. On 27 October Addor, Blanchard, and Krugel left C2 at 9 am. Blanchard reached summit of Himlung at 3 pm; Addor and Krugel stopped at 200m below the summit. They descended together to C2 at 6 pm slept there. Next day to Phu Kang BC. Addor, Ms Bonard, Krugel and Tejedor went to Ratna Chuli BC on 1 November to see the possible way to Phu Kang and returned to BC same day. They saw from Ratna Chuli BC the beginning and end of the glacier and Phu Kang but they could not see the middle part of the glacier. The team returned to Kathmandu on 7 November. Members planning to visit Chitwan and some other places then will leave the country on 16 November.
Accidents -
Achievement -
Agency Pike Peak Trekking
Commercial Route False
Standard Route False
Primary Route False
Primary Member False
Primary Reference False
Primary ID -
Checksum 2458114
Year 2008
Summit Success False
O2 Summary None
Route (lowercase) s ridge

Members

6 recorded members.

Name Sex Year of Birth Citizenship Status Residence Occupation
Guenole Addor M 1980 Switzerland Climber Lausanne, Switzerland Physician (internal medicine) Details Other expeditions
Hubert Blanchard M 1972 Switzerland Climber Vevey, Vaud, Switzerland Engineer in mircotechnology Details Other expeditions
Aline Bonard F 1976 Switzerland Climber Lausanne, Switzerland Attorney Details Other expeditions
Paola Jacquemettaz F 1977 Switzerland Climber Vevey, Vaud, Switzerland Retired client advisor in a bank Details Other expeditions
Vincent Pierre Krugel M 1976 Switzerland Climber Echallens, Vaud, Switzerland Physician (anesthesiologist) Details Other expeditions
Gerard Tejedor M 1973 France Leader Lausanne, Switzerland Engineer specializing in energy and environment Details Other expeditions

References

0 recorded references.