Lhotse Shar | 2019 S Face

A Spain expedition to Lhotse Shar in 2019 via S Face, led by Jordi Tosas. Summit reached on 14th May 2019. 2 members recorded.

Expedition Details

Field Value
ID 10299
Imported 2026-03-06 18:04:49.359634
Expedition ID LSHR19101
Peak ID LSHR
Year 2019
Season 1
Host Country 1
Route 1 S Face
Route 2 -
Route 3 -
Route 4 -
Nationality Spain
Leaders Jordi Tosas
Sponsor Spanish Lhotse Shar Expedition 2019
Success 1 False
Success 2 False
Success 3 False
Success 4 False
Ascent 1 -
Ascent 2 -
Ascent 3 -
Ascent 4 -
Claimed False
Disputed False
Countries -
Approach Lukla->Pangboche->Chhukung BC
Basecamp Date 2019-04-21
Summit Date 2019-05-14
Summit Time -
Summit Days 23
Total Days 30
Termination Date 2019-05-21
Termination Reason 5
Termination Notes Abandoned at 6900m due to dry conditions of the mountain
High Point (m) 6900
Traverse False
Ski False
Paraglide False
Camps 3
Fixed Rope (m) 0
Total Members 2
Summit Members 0
Member Deaths 0
Total Hired 0
Summit Hired 0
Hired Deaths 0
No Hired True
O2 Used False
O2 None True
O2 Climb False
O2 Descent False
O2 Sleep False
O2 Medical False
O2 Taken False
O2 Unknown False
Other Summits -
Campsites BC(21/04,4700m),Biv1(06/05),Biv2(07/05),Biv3(14/05),xxx(14/05,6900m)
Route Notes BC 21/04 4700m (at Chhukung Village) C1 06/05 at Imjatse La C2 07/05 at serac C3 14/05 at cave Hpt 14/05 6900m at place on the right same level than huge serac barrier at c7000m by both members. Climb abandoned on on 14 May due to dry conditions of the mountain. Acclimatization: Running on Island Peak. Ama Dablam: April 26. Duet started from BC. New route without name using a gully in a very logical obvious elegant dihedral (800m/WI4), reaching a notch at c6040m straight E below the 6182m bump lying ESE of Ama Dablam. Down by the same route on same day. Nuptse (S Face): British ridge with mushrooms, seracs, icefall. Tried it in alpine style. Very dry conditions. Reconnaissance on April 28. Apr 30: 1st climbing day. Chhukung La, then bivouac on the ridge. Technical in such conditions. May 01: second bivouac at the same place. High point in the ridge. May 02: back down to BC. Hard conditions. Lhotse Shar: BC at Chhukung (lodge) Really dry conditions season. More seracs. Since autumn 1996. Saw camps of the Koreans. Approched by LSHR glacier. Stayed on the ridge from Imjatse La. System use of 6mm rope, very quick method of abseil. 2 days rappeling down. May 06: acclimatization more on the route. Slept at Imjatse La. May 07: climbed to just above to the seracs. Bivouac on top of serac inside a cave (c.”69” p151). Prepared some abalakovs to prepare the descent, to save some time. One night in the col. May 08: down to BC. Waited for best forecast announcements. Wind going down, but precipitation up! May 12: Chhukung to Col. Snowfall all day May 13: Col to serac bivy. Snowfall all day. May 14: Climbed up nicely in the morning … at 12h bad weather. Spindrifts... Long section of climbing: down, back up, this just below Pt 7143m. c6900m maximum. Late in the afternoon, decided to come back to cave against the rock. Bivy there. May 15: Down to previous serac bivy. Rappeling. May 16: Down to col. Rappeling. May 17: Col down to Chhukung. 20 kms. Had tried it already until below the serac in 2010. Team left BC on on May 21. Route: Austrian route 1970 from Lhotse Shar glacier. Oxygen: Not taken, not used. Other peaks: AMAD, NUPT, peak without name nearby Kongma La.
Accidents -
Achievement -
Agency Amitayus Trekking
Commercial Route False
Standard Route False
Primary Route False
Primary Member False
Primary Reference False
Primary ID -
Checksum 2462797
Year 2019
Summit Success False
O2 Summary None
Route (lowercase) s face

Members

2 recorded members.

Name Sex Year of Birth Citizenship Status Residence Occupation
Jordi Tosas Robert M 1968 Spain Leader Bonansa, Huesca, Spain Alpine guide Details Other expeditions
Jorge (Jordi) Corominas Garcia M 1958 Spain Climber Sahun, Huesca, Spain Alpine guide Details Other expeditions

References

1 recorded references.