Khatang | 2025 S Face
A Switzerland expedition to Khatang in 2025 via S Face, led by Stephan Siegrist. Summit reached on 2nd October 2025. 3 members recorded.
Expedition Details
Change history — how this expedition, its members and references have changed between database releases.
| Field | Value |
|---|---|
| ID | 8250 |
| Imported | 2026-11-04 22:32:23.994980 |
| Expedition ID | KHAT25301 |
| Peak ID | KHAT |
| Year | 2025 |
| Season | 3 |
| Host Country | 1 |
| Route 1 | S Face |
| Route 2 | - |
| Route 3 | - |
| Route 4 | - |
| Nationality | Switzerland |
| Leaders | Stephan Siegrist |
| Sponsor | Holiday Himalaya Khatang Expedition 2025 |
| Success 1 | False |
| Success 2 | False |
| Success 3 | False |
| Success 4 | False |
| Ascent 1 | - |
| Ascent 2 | - |
| Ascent 3 | - |
| Ascent 4 | - |
| Claimed | False |
| Disputed | False |
| Countries | - |
| Approach | To Taksindu from KTM by Jeep->trek via Dudh Kunda |
| Basecamp Date | 2025-09-27 |
| Summit Date | 2025-10-02 |
| Summit Time | - |
| Summit Days | 5 |
| Total Days | 17 |
| Termination Date | 2025-10-14 |
| Termination Reason | 5 |
| Termination Notes | Abandoned at 5300 due bad snow conditions and member illness |
| High Point (m) | 5300 |
| Traverse | False |
| Ski | False |
| Paraglide | False |
| Camps | 0 |
| Fixed Rope (m) | 0 |
| Total Members | 3 |
| Summit Members | 0 |
| Member Deaths | 0 |
| Total Hired | 0 |
| Summit Hired | 0 |
| Hired Deaths | 0 |
| No Hired | True |
| O2 Used | False |
| O2 None | True |
| O2 Climb | False |
| O2 Descent | False |
| O2 Sleep | False |
| O2 Medical | False |
| O2 Taken | False |
| O2 Unknown | False |
| Other Summits | - |
| Campsites | BC(27/09,4700m),ABC(02/10,5300m),xxx |
| Route Notes | Approach: To Taksindu from KTM by Jeep. Then trek via Dudh Kunda. BC 27/09 2700m at northern shore of Dudh Kunda Lake ABC 02/10 5300m at snowy plateau at the foot of Khatang South Face. Hpt 5300n at ABC Climb abandoned on 14/10 at ABC due to snow conditions, and altitude sickness of Sala. Plan A was to climb a new route on the South Face in about 4-5 days from ABC to the top. Plan B was SE Ridge. They had planned on fixing some rope in the lower part of the South Face, which they figured was the most technical and dangerous part of the face. Sala got altitude sickness at first night at ABC on 02/10. He went down to BC the next day and recovered a little, others stayed at ABC for another night. On 03/10 and 04/10 lots of snowfall, forcing Siegrist and Schuepbach to go down to BC on 04/10. Everyone down to lodges below Dudh Kundha Lake. Went up again to ABC after the snow, but eventually abandoned attempt on 14/10. Left BC on 14/10. Climbing route: South Face Oxygen: Not taken, not used |
| Accidents | - |
| Achievement | - |
| Agency | Holiday Himalaya Treks |
| Commercial Route | False |
| Standard Route | False |
| Primary Route | False |
| Primary Member | False |
| Primary Reference | False |
| Primary ID | - |
| Checksum | 2465226 |
| Year | 2025 |
| Summit Success | False |
| O2 Summary | None |
| Route (lowercase) | s face |
Members
3 recorded members.
| Name | Sex | Year of Birth | Citizenship | Status | Residence | Occupation | |
|---|---|---|---|---|---|---|---|
| Stephan Siegrist | M | 1972 | Switzerland | Leader | Ringgenberg, Bern, Switzerland | Alpine guide | Details Other expeditions |
| Filippo Sala | M | 2002 | Switzerland | Climber | - | Alpine guide | Details Other expeditions |
| Silvan Schuepbach | M | 1982 | Switzerland | Climber | - | - | Details Other expeditions |
References
0 recorded references.