Gyajikang | 2012 W Ridge

A France expedition to Gyajikang in 2012 via W Ridge, led by Mickael Croizet. Summit reached on 23rd October 2012. 10 members recorded.

Expedition Details

Field Value
ID 7809
Imported 2026-03-06 18:04:49.359634
Expedition ID GYAJ12301
Peak ID GYAJ
Year 2012
Season 3
Host Country 1
Route 1 W Ridge
Route 2 -
Route 3 -
Route 4 -
Nationality France
Leaders Mickael Croizet
Sponsor Gyajikang 2012
Success 1 True
Success 2 False
Success 3 False
Success 4 False
Ascent 1 8th
Ascent 2 -
Ascent 3 -
Ascent 4 -
Claimed False
Disputed False
Countries -
Approach Via Nar Phu Valley
Basecamp Date 2012-10-13
Summit Date 2012-10-23
Summit Time -
Summit Days 10
Total Days 12
Termination Date 2012-10-25
Termination Reason 1
Termination Notes -
High Point (m) 7074
Traverse False
Ski False
Paraglide False
Camps 4
Fixed Rope (m) 150
Total Members 8
Summit Members 5
Member Deaths 0
Total Hired 2
Summit Hired 2
Hired Deaths 0
No Hired False
O2 Used False
O2 None True
O2 Climb False
O2 Descent False
O2 Sleep False
O2 Medical False
O2 Taken False
O2 Unknown False
Other Summits -
Campsites BC(13/10,6750m),C1(16/10,5400m),C2(19/10,5700m),C3(21/10,6050m),C4(22/10,6250m),Smt(23/10)
Route Notes On 18th October the team climbed to C2 from BC then slept at C1. This day Philippe Poincloux left the expedition and came to Kathmandu because he was obviously not on the good travel. On 19th October the team (Charlot, Chatellain, Croizet, Froger and Le Menajour) climbed to C3 from C1 and slept at C2. This day, Christophe Mattern left for trekking because he was technically not enough skilled. He joined the team back in Kathmandu. On 20th October the team had a rest at C2. On 21st October the team joined C3 and slept there. On 22nd October the slept at C4. On 23rd October the team reached the summit. Gyajikang consists of a very long ridge necessiting 4 camps. The team climbed almost in alpine style: Mickael Croizet had 2 clients on his rope and the two Sherpas were give one client each. Yves Froger contracted light 1st degree frosbites on the fingers (used Deflecten on it). Julien Sanchez stayed most of time at the base camp, being very sick when he slept one time at C2. Fixed rope, oxygen and Sherpas: The team fixed 150m of rope: 40m above C2 (loose rock section) and 110m from C4 to the summit (on the sharp ridge with steep slopes, Mickael Croizet had to put in a hand rope). He left 80 meters on the ridge and took back the remnant. The team didn't use oxygen, but carried its hyperbaric chamber until C3 (didn't use it). Sherpas: Ang Dawa Sherpa, 18/11/84, Jubing-1, Kharikhola Pasang Tenzing Sherpa, 25/2/1988, Jubing-1, Kharikhola
Accidents -
Achievement -
Agency Thamserku Trekking
Commercial Route False
Standard Route False
Primary Route False
Primary Member False
Primary Reference False
Primary ID -
Checksum 2458596
Year 2012
Summit Success True
O2 Summary None
Route (lowercase) w ridge

Members

10 recorded members.

Name Sex Year of Birth Citizenship Status Residence Occupation
Pierre Jean Maurice Charlot M 1979 France Climber Gap, Hautes-Alpes, France Civil engineer Details Other expeditions
Patrick Jean Francois Chatellain M 1957 France Climber Bonneville, Haute Savoie, France Physician Details Other expeditions
Mickael Gerard Croizet M 1973 France Leader Passy, Haute-Savoie, France Alpine guide & ski instructor Details Other expeditions
Yves Claude Marie Froger M 1962 France Climber Plouegat-Guerrand, Finistere, France Pharmacist Details Other expeditions
Pascal Le Menajour M 1973 France Climber Briancon, Hautes-Alpes, France Mason Details Other expeditions
Christophe Marcel Joseph Mattern M 1965 France Climber Oltingue, Haut-Rhin, France Technical manager in national forestry office Details Other expeditions
Philippe Andre Jean Poincloux M 1952 France Climber Paris, France Executive of Human Resources Management Society Details Other expeditions
Julien Bernard Sanchez M 1979 France Climber Viroflay, Yvelines, France Water treatment engineer Details Other expeditions
Ang Dawa Sherpa M 1984 Nepal H-A Worker Kharikhola, Solukhumbu - Details Other expeditions
Pasang Tendi Sherpa M 1988 Nepal H-A Worker Kharikhola, Solukhumbu - Details Other expeditions

References

0 recorded references.