Everest | 2011 S Col-SE Ridge
A UK expedition to Everest in 2011 via S Col-SE Ridge, led by David Hamilton. Summit reached on 16th May 2011. 20 members recorded.
Expedition Details
| Field | Value |
|---|---|
| ID | 7092 |
| Imported | 2026-03-06 18:04:49.359634 |
| Expedition ID | EVER11134 |
| Peak ID | EVER |
| Year | 2011 |
| Season | 1 |
| Host Country | 1 |
| Route 1 | S Col-SE Ridge |
| Route 2 | - |
| Route 3 | - |
| Route 4 | - |
| Nationality | UK |
| Leaders | David Hamilton |
| Sponsor | Jagged Globe Everest Expedition 2011 |
| Success 1 | True |
| Success 2 | False |
| Success 3 | False |
| Success 4 | False |
| Ascent 1 | - |
| Ascent 2 | - |
| Ascent 3 | - |
| Ascent 4 | - |
| Claimed | False |
| Disputed | False |
| Countries | Estonia |
| Approach | - |
| Basecamp Date | 2011-04-08 |
| Summit Date | 2011-05-16 |
| Summit Time | 0555 |
| Summit Days | 38 |
| Total Days | 50 |
| Termination Date | 2011-05-28 |
| Termination Reason | 1 |
| Termination Notes | - |
| High Point (m) | 8849 |
| Traverse | False |
| Ski | False |
| Paraglide | False |
| Camps | 4 |
| Fixed Rope (m) | 0 |
| Total Members | 12 |
| Summit Members | 12 |
| Member Deaths | 0 |
| Total Hired | 10 |
| Summit Hired | 8 |
| Hired Deaths | 0 |
| No Hired | False |
| O2 Used | True |
| O2 None | False |
| O2 Climb | True |
| O2 Descent | False |
| O2 Sleep | True |
| O2 Medical | False |
| O2 Taken | False |
| O2 Unknown | False |
| Other Summits | - |
| Campsites | BC(08/04,5250m),C1(19/04,6100m),C2(24/04,6400m),C3(03/05,7200m),C4(15/05,7900m),Smt(16,25/05) |
| Route Notes | Jagged Globe Everest Expedition - 2 June 2011 (led by David Hamilton) All twelve members went to the summit. Eight summited on 16 May with seven Sherpas, and four more members with four Sherpas on the 25th; of the Sherpas, three went to the top twice. The first summit party left C4 on the 15th at 9:30 pm and reached the summit with Hamilton in the lead between 6:00 and 6:30 am on the 16th. They were Chambers, Chapman, Gott, Hamilton, Kaasik, Smith, Tuuleveski and Wade. The Sherpas with them were Mingma Tsiri, Pasang Tenzing, Pem Chhiri, [Pema Chhiri], Tshering Pemba, Thundu and Wangdi. The group returned to C4 between 10:00 am and 11:30 am. They were in C2 the next day and BC on the 18th. The second summit party left C4 on the 24 May at 9:30 pm and most of them summited at 7:45 am and were back in C4 at 12:00 noon. These climbers were Parks, Pinnock and Smith with Mingma Tsiri, Pasang Tenzing, Pem Chhiri and Pemba Chongbi. Williams and Pasang Tenzing were on the top at 10:30 am and got down to C4 at 2:00 pm. For Mingma Tsiri and Pasang Tenzing, this was their second ascent this month: they had summited and descended to BC with the first party. The members used oxygen from C2 to the summit to C3. The Sherpas used it from C4 to the top to and in C4. The only casualties were: Parks, whose left big toe was frostbitten, and by the time he had returned to BC it had blistered and was on the way to healing. He wanted to climb Elbrus in July. Wade suffered from blurred vision when he was descending from the summit to C4, but it was back to normal when he was back in BC. The cause was wind getting into his cornea. He had an eye surgery ten years previously. Sherpas: Mingma Tsiri Sherpa, 1/8/70, Beding (one of the 7 Brothers), Everest X15, Cho Oyu X3, Dhaulagiri X1, Manaslu X1 Pasang Tenzing Sherpa, 1/10/84, Beding (a brother) Everest X6, Cho Oyu X2 Pem Chhiri Sherpa, 3/3/80 (20/11/2036), Chankhu-6, Dolakha Pemba Chongbi Sherpa, [29/6/85] (15/3/2042), Kharikhola, Solu Pemba Tshering (Pem Chhiri) Sherpa, 16/12/80, Chankhu-6, Dolakha, Everest X4, Cho Oyu X2 Thundu Sherpa, 18/2/78, Beding (a brother), Everest X5, Cho Oyu X2, Manaslu X1 Wangdi Sherpa, (18/11/2045), Shyama, Dolakha |
| Accidents | - |
| Achievement | - |
| Agency | Summit Nepal Trekking |
| Commercial Route | True |
| Standard Route | True |
| Primary Route | False |
| Primary Member | False |
| Primary Reference | False |
| Primary ID | - |
| Checksum | 2462074 |
| Year | 2011 |
| Summit Success | True |
| O2 Summary | Used |
| Route (lowercase) | s col-se ridge |
Members
20 recorded members.
| Name | Sex | Year of Birth | Citizenship | Status | Residence | Occupation | |
|---|---|---|---|---|---|---|---|
| Geoffrey Douglas Chambers | M | 1964 | UK | Climber | Richhill, Armagh, Northern Ireland | Engineer | Details Other expeditions |
| Andrew Stuart (Andy) Chapman | M | 1968 | UK | Deputy Leader | Little Sutton, Cheshire, England | Alpine instructor | Details Other expeditions |
| Dave Gott | M | 1959 | UK | Climber | Bristol, Avon, England | IT consultant | Details Other expeditions |
| David William Hamilton | M | 1961 | UK | Leader | Nuneaton, Warwick, England | Timber company manager | Details Other expeditions |
| Richard David Parks | M | 1977 | UK | Climber | Newport, Gwent, England | Retired professional rugby player | Details Other expeditions |
| Andras Kaasik | M | 1971 | Estonia | Climber | Tallinn, Estonia | Timber company manager | Details Other expeditions |
| Mark Anthony Pinnock | M | 1960 | UK | Climber | Chelmsford, Essex, England | Commercial cleaning company director | Details Other expeditions |
| Adam Robert Potter | M | 1975 | UK | Climber | Ludford, Lincoln, England | Landfill manager | Details Other expeditions |
| Martin Howard Smith | M | 1954 | UK | Climber | Balikpapan, Kaltim, Indonesia | Geologist | Details Other expeditions |
| Tanel Tuuleveski | M | 1975 | Estonia | Climber | Tallinn, Estonia | Forestry manager | Details Other expeditions |
| Alan Victor Wade | M | 1966 | UK | Climber | Glasgow, Scotland | IT company director | Details Other expeditions |
| Stephen David (Steve) Williams | M | 1976 | UK | Climber | Henley-on-Thames, Oxford, England | Retired Olympic rower (gold medalist) | Details Other expeditions |
| Mingma Tshering/Tsiri Sherpa | M | 1970 | Nepal | H-A Worker | Beding, Dolakha | - | Details Other expeditions |
| Pasang Tenzing Sherpa | M | 1984 | Nepal | H-A Worker | Beding, Dolakha | - | Details Other expeditions |
| Pema Tshering (Pem Chhiri) Sherpa | M | 1980 | Nepal | H-A Worker | Chankhu-6, Dolakha | - | Details Other expeditions |
| Pemba Chhongbi Sherpa | M | 1985 | Nepal | H-A Worker | Kharikhola, Solukhumbu | - | Details Other expeditions |
| Tshering Pemba Sherpa | M | 1985 | Nepal | H-A Worker | Beding, Dolakha | - | Details Other expeditions |
| Thundu Sherpa | M | 1978 | Nepal | H-A Worker | Beding, Dolakha | - | Details Other expeditions |
| Wangdi Sherpa | M | 1989 | Nepal | H-A Worker | Shyama-4, Dolakha | - | Details Other expeditions |
| Pema Chhiring/Chhiri Sherpa | M | 1983 | Nepal | H-A Worker | Beding, Dolakha | - | Details Other expeditions |
References
1 recorded references.
| Expedition ID | Journal | Author | Title | Publisher | Citation | Yak 94 |
|---|---|---|---|---|---|---|
| EVER11134 | - | - | http://www.jagged-globe.co.uk/news/despatches_list.html?id=36 | - | - | - |