Everest | 2009 S Col-SE Ridge

A USA expedition to Everest in 2009 via S Col-SE Ridge, led by Damian Benegas. Summit reached on 19th May 2009. 5 members recorded.

Expedition Details

Field Value
ID 6397
Imported 2026-03-06 18:04:49.359634
Expedition ID EVER09130
Peak ID EVER
Year 2009
Season 1
Host Country 1
Route 1 S Col-SE Ridge
Route 2 -
Route 3 -
Route 4 -
Nationality USA
Leaders Damian Benegas
Sponsor Patagonian Brothers Everest Expedition 2009
Success 1 True
Success 2 False
Success 3 False
Success 4 False
Ascent 1 -
Ascent 2 -
Ascent 3 -
Ascent 4 -
Claimed False
Disputed False
Countries Argentina
Approach -
Basecamp Date 2009-04-13
Summit Date 2009-05-19
Summit Time 0920
Summit Days 36
Total Days 41
Termination Date 2009-05-24
Termination Reason 1
Termination Notes -
High Point (m) 8849
Traverse False
Ski False
Paraglide False
Camps 4
Fixed Rope (m) 200
Total Members 4
Summit Members 4
Member Deaths 0
Total Hired 2
Summit Hired 1
Hired Deaths 0
No Hired False
O2 Used True
O2 None False
O2 Climb True
O2 Descent False
O2 Sleep True
O2 Medical False
O2 Taken False
O2 Unknown False
Other Summits -
Campsites BC(13/04),C1(21/04,5900m),C2(27/04,6450m),C3(17/05,7150m),C4(18/05,7400m),Smt(18/05)
Route Notes All four members and Palden Nima left C4 at 9:30 pm on 18 May to go to the top. Benegas, Collinson, Sahores and Palden Nima reached the summit at 9:20 am on the 19th. Rehfeld, who is 64 years old, was much slower than they; in his descent from the summit, Benegas had to turn back at the top of the Hillary Step and take him up the fixed ropes, waiting in the queue for others to move, and they got to the top at 11:30 am (in the team's first ascent, they climbed past the slower ones on the ropes). Collinson, Sahores and Palden Nima returned to C4 at 1:30 pm while Rehfeld, who was very tired and needed to rest, and Benegas were in C4 at 7:20 pm. Benegas spent time in his descent to fix 120 meters of rope 200m below the South Summit to permit two-way traffic, and to help to get the exhausted independent Irishman Martin Byrne down the camp. All of this team returned to C2 on the 20th and to BC on the 21st. Oxygen was used by the members in C3 to the top to and in C3. Palden Nima used it from C4 to the top to C4. Sherpa: Palden Nima, 29/8/78, Yaphu-9, Makalu, Everest X2
Accidents -
Achievement -
Agency High Altitude Dreams
Commercial Route True
Standard Route True
Primary Route False
Primary Member False
Primary Reference False
Primary ID -
Checksum 2461255
Year 2009
Summit Success True
O2 Summary Used
Route (lowercase) s col-se ridge

Members

5 recorded members.

Name Sex Year of Birth Citizenship Status Residence Occupation
Damian Benegas M 1968 USA Leader Sandy, Utah Alpine guide Details Other expeditions
John Carl Collinson M 1992 USA Climber Snowbird, Utah Extreme skier & student Details Other expeditions
Eugene Elwood (Gene) Rehfeld M 1945 USA Climber Golden, Colorado Retired businessman Details Other expeditions
Mercedes N. Sahores F 1974 Argentina Climber Bariloche, Rio Negro, Argentina Biologist Details Other expeditions
Palden Nima Sherpa M 1978 Nepal H-A Worker Yaphu-9, Makalu-Barun - Details Other expeditions

References