Expedition DHA108103 (2008) — change history
Changes by release
2018-12-16 release 16th Dec 2018
-
Changed DHA108103 (2008) — NE Ridge 1 field
Field Before After Route Notes C1 at NE Col C2 on NE Ridge C3 on NE Ridge. 72 members and1Muktu Sherpa left C3 at 2:40 am and … route was; for second group no such problem. Rope fixed: 200m BC to C1, 200m C2 … Lhakpa, 2/8/72, Tashigaon, Makalu, Everest X2, K2 X1 Pasang Temba, 20/1/83, Makalu-5, no 8000ers[Ever X1] (reached C3 but did not join summit push because had bad headache and stayed in camp)