Ama Dablam | 2013 SW Ridge

A New Zealand expedition to Ama Dablam in 2013 via SW Ridge, led by Mark Philip Bellamy. Summit reached on 26th October 2013. 2 members recorded.

Expedition Details

Field Value
ID 8228
Imported 2026-03-06 18:04:49.359634
Expedition ID AMAD13303
Peak ID AMAD
Year 2013
Season 3
Host Country 1
Route 1 SW Ridge
Route 2 -
Route 3 -
Route 4 -
Nationality New Zealand
Leaders Mark Philip Bellamy
Sponsor A Kiwi on Ama Dablam
Success 1 False
Success 2 False
Success 3 False
Success 4 False
Ascent 1 -
Ascent 2 -
Ascent 3 -
Ascent 4 -
Claimed False
Disputed False
Countries -
Approach Flew to Phortse->Pangboche->Dingboche
Basecamp Date 2013-10-23
Summit Date 2013-10-26
Summit Time -
Summit Days 3
Total Days 4
Termination Date 2013-10-27
Termination Reason 5
Termination Notes Abandoned at 5812m due to excessive snow and no fixed ropes
High Point (m) 5812
Traverse False
Ski False
Paraglide False
Camps 1
Fixed Rope (m) 0
Total Members 1
Summit Members 0
Member Deaths 0
Total Hired 1
Summit Hired 0
Hired Deaths 0
No Hired False
O2 Used False
O2 None True
O2 Climb False
O2 Descent False
O2 Sleep False
O2 Medical False
O2 Taken False
O2 Unknown False
Other Summits -
Campsites BC(23/10,4594m),C1(25/10,5400m),xxx(26/10,5812m)
Route Notes -5 degrees in the tent at base camp on morning of 25th. Left at 8:35 am, up snow fields to yak camp. Arrived at 11:40 am, icy trail. 12:30-2:15 pm to C1. Normally a boulder field, this was largely filled in with snow. Down to -10 in tent that night. Saturday 26 left C1 at 7:50 am (beautiful views). About 2 hours to C2. Not carrying anything and super fun climbing. From the bottom of the grey tower took photos of the C2 tower. Back down to C1 in about an hour. Tiring with all the warm wraps. Coming down the boulder field difficult because of falling through the snow between the rocks. ABC/yak camp back down to base was a long boring slog in an icy rutt. Arrived 5 pm. Several slips on way down. Bellamy plans to join IMG for Everest south side in spring 2014. Sherpa: Phunuru Sherpa, Phortse, 16/5/1980
Accidents -
Achievement -
Agency Phu Nuru (Himalayan Ascent pmt)
Commercial Route True
Standard Route False
Primary Route False
Primary Member False
Primary Reference False
Primary ID -
Checksum 2461350
Year 2013
Summit Success False
O2 Summary None
Route (lowercase) sw ridge

Members

2 recorded members.

Name Sex Year of Birth Citizenship Status Residence Occupation
Mark Philip Bellamy M 1978 New Zealand Leader Auckland, New Zealand IT consultant Details Other expeditions
Phu Nuru (Phunuru) Sherpa M 1980 Nepal H-A Worker Phortse, Khumbu - Details Other expeditions

References

0 recorded references.